Version 18 (modified by 12 years ago) (diff) | ,
---|
Project Number
1774 and 1833
(includes work originally started on 1613)
Project Title
OpenFlow Campus Trials at Stanford University a.k.a. OFSTAN
Technical Contacts
PI: Nick McKeown nickm@stanford.edu
Guru Parulkar parulkar@stanford.edu
Participating Organizations
Stanford University, Palo Alto CA
GPO Liaison System Engineer
Josh Smift Josh Smift
Scope
This project will deploy an OpenFlow, testbed throughout the Stanford University campus. This project will develop OpenFlow extensions focused on the creation of flexible, heterogeneous slices, the development of a generic load balancer and a captive portal for authentication. This work is a precursor to the deployment of OpenFlow into campus production networks.
Current Capabilities
Stanford OpenFlow deployment
- Three OpenFlow VLANs (74 for production traffic, 374 for experimental traffic, 901 for demos)
- Eight OpenFlow switches (HP, NEC, Quanta, and Toroki)
- FlowVisor, SNAC, and NOX controllers
- Production user traffic
Milestones
Spiral 4
- MilestoneDate(OFSTAN: S4.a Continue to integrate campus networks with GENI)?
- MilestoneDate(OFSTAN: S4.b Continue to address known bugs)?
- MilestoneDate(OFSTAN: S4.c Support OpenFlow software)?
- MilestoneDate(OFSTAN: S4.d Operate a campus GENI aggregate)?
- MilestoneDate(OFSTAN: S4.e Integrate new OpenFlow control software)?
Project Technical Documents
Quarterly Status Reports
2010-Q1 Status Report
2011-Q1 Status Report
GEC
Stanford's slides from the OpenFlow meeting at GEC 7
Spiral 2 Connectivity
Campus Network Connectivity Diagram
Related Projects
OFSTAN
OFCLEM
OFGT
OFIU
OFPR
OFRG
OFUWA
OFUWI
OFNOX
EnterpriseGeni
The OpenFlow switch Consortium
NOX
SNAC
FlowVisor
Deploying OpenFlow
Enterprise-GENI
E-GENI Aggregate Manager
Attachments (3)
-
stanford-connectivity.png (108.8 KB) - added by 15 years ago.
Stanford connectivity diagram
-
GEC7-openflow-meeting-slides-OFSTAN.pdf (1.3 MB) - added by 14 years ago.
Stanford's slides from the OpenFlow meeting at GEC 7
-
E-GENI-Status-report-Q1-2010.doc (172.5 KB) - added by 14 years ago.
OFSTAN 2010 Q1 status report
Download all attachments as: .zip