wiki:OFPR-Post-GEC11-status

Version 1 (modified by scott@cs.princeton.edu, 13 years ago) (diff)

--

OFPR Project Status Report

Period: GEC10 to GEC11 (Mar 18, 2011 to Jul 28, 2011)

I. Major accomplishments

A. Milestones achieved

[S3.a] Deployed additional HP ProCurve switches so that within the CS Building, we now have four separate kinds of switches that users can connect to:

In addition, the aggregation switches are now configured to carry both "inside" VLANs and "outsside" VLANs. This is a departure from the complete physical isolation of our "inside" and "outside" traffic. Aggregation switches remain locked down.

B. Deliverables made

N/A

II. Description of work performed during last quarter

A. Activities and findings

  • Participated in bi-weekly tele-conference call with Stanford group.
  • [S3.d] Scott Karlin attended GEC11.
  • Christopher Tengi moved off the project (as of May 2011) we are actively searching for a new staff member.
  • Upgraded CS Building core switch with an HP ProCurve
  • Installed HP ProCurve at remote site to support VICCI cluster (VICCI uses OpenFlow-capable top-of-rack switches)

B. Project participants

Michael Freedman, Jennifer Rexford, Scott Karlin, Christopher Tengi

C. Publications (individual and organizational)

None

D. Outreach activities

None

E. Collaborations

  • Worked with Srini Seetharaman to upgrade our modest MyPLC deployment

F. Other Contributions

None