     1= OFPR Project Status Report =
     2
     3Period: GEC9 to GEC10 (Nov 5, 2010 to Mar 17, 2011)
     4
     5== I. Major accomplishments ==
     6
     7=== A. Milestones achieved ===
     8
     9['''S3.a'''] Deployed three additional HP ProCurve switches in three separate buildings on the CS network: one switch in the main CS machine room for building connections, one switch in the Friend Center to connect the instructional lab used for OS and Networking courses, and one switch at 221 Nassau Street to connect the PlanetLab staff.  Deployment of additional switches is planned.
     10
     11=== B. Deliverables made ===
     12
     13N/A
     14
     15== II. Description of work performed during last quarter ==
     16
     17=== A. Activities and findings ===
     18
     19* Participated in bi-weekly tele-conference call with Stanford group.
     20* Christopher Tengi attended GEC10.
     21* Chris worked with BigSwitch to evaluate their Beacon OpenFlow controller.
     22* Chris deployed a server running Flowvisor 0.7 and supported developers in debugging.
     23* Met with Juniper several times to discuss their OpenFlow plans.
     24
     25=== B. Project participants ===
     26
     27Michael Freedman, Jennifer Rexford, Scott Karlin, Christopher Tengi
     28
     29=== C. Publications (individual and organizational) ===
     30
     31None
     32
     33=== D. Outreach activities ===
     34
     35None
     36
     37=== E. Collaborations ===
     38
     39None
     40
     41=== F. Other Contributions ===
     42
     43None