Changes between Version 2 and Version 3 of OFNLR-2010Q2-status
- Timestamp:
- 09/02/10 14:33:45 (14 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
OFNLR-2010Q2-status
v2 v3 3 3 == Period: 2010-Q2 == 4 4 5 This project will deploy and operate OpenFlow-enabled HP Procurve 6600 switches at 5 NLR PoPs and interconnect NLR’s FrameNet network to the GENI OpenFlow-enabled backbone, permitting members and non-members of NLR to connect to GENI OpenFlow services.[[BR]]5 This project will deploy and operate OpenFlow-enabled HP Procurve 6600 switches at 5 NLR !PoPs and interconnect NLR’s FrameNet network to the GENI OpenFlow-enabled backbone, permitting members and non-members of NLR to connect to GENI OpenFlow services.[[BR]] 6 6 7 7 === I. Major accomplishments''' ===