     1= OFNLR Project Status Report =
     2
     3== Period: 2010-Q2 ==
     4
     5This project will deploy and operate OpenFlow-enabled HP Procurve 6600 switches at 5 NLR PoPs and interconnect NLR’s FrameNet network to the GENI OpenFlow-enabled backbone, permitting members and  non-members of NLR to connect to GENI OpenFlow services.[[BR]]
     6
     7=== I. Major accomplishments''' ===
     8
     9'''A. Milestones achieved'''[[BR]]
     10
     11     [[BR]]
     12
     13'''B. Deliverables made'''[[BR]]
     14
     15 * Equipment installation planning completed
     16 * Switches and supporting components acquired
     17 * Switches deployed to 4 of the 5 PoP locations
     18
     19=== II. Description of work performed during last quarter ===
     20
     21'''A. Activities and findings'''[[BR]]
     22
     23 * Equipment planning and installation
     24    * Verified availability of rack space, AC power, and cooling in each of the designated PoPs
     25    * Generated optical engineering design and verified available optical wavelength and slotting capacity throughout the Layer 1 WaveNet path
     26    * Confirmed availability of Layer 2 FrameNet ports and optics and out-of-band ports
     27    * Generated installation and cross-connect orders
     28    * Switches installed in Atlanta, Sunnyvale, Seattle, and Chicago
     29
     30 * Switch and system components ordering
     31    * Selected HP 6600-24G-4XG switch
     32    * Used the information from the “Equipment planning and installation” activity to generate component purchase list
     33    * Placed orders for all equipment
     34
     35 * OpenFlow controller installed and tested based on OpenFlow 1.0
     36
     37 * Planning for GEC8 demo
     38
     39'''B. Project participants'''[[BR]]
     40
     41 * PI: Glenn Ricart, NLR CEO
     42 * Grover Browning, NLR Director of Engineering and Operations
     43 * Andrew Lee, Network Engineer
     44 * Ron Milford, Network Engineer
     45 * Chris Small, Systems Engineer
     46 * Kathy Benninger, Project Manager
     47
     48'''C. Publications (individual and organizational)''' [[BR]]
     49
     50'''D. Outreach activities'''[[BR]]
     51
     52'''E. Collaborations'''[[BR]]
     53
     54 * GPO/Stanford/IU collaboration and discussion led to:
     55    * Choosing an OpenFlow-enabled switch with primarily 1GbE ports for direct connections
     56    * Adding Layer 2 FrameNet connections to all OpenFlow switches
     57
     58 * GPO/Internet2
     59    * NLR Internet 2 backbone connection planning in Atlanta
     60
     61
     62'''F. Other Contributions'''[[BR]]