Changes between Version 4 and Version 5 of OFIU-2Q10Q3-status


Ignore:
Timestamp:
01/10/11 22:46:49 (14 years ago)
Author:
chsmall@grnoc.iu.edu
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • OFIU-2Q10Q3-status

    v4 v5  
    11= OpenFlow Campus Trials at Indiana University GEC9 Report =
    22
    3 Christopher Small – Principal Investigator[BR]
    4 Matthew Davy – Co-Principal Investigator[BR]
    5 Dave Jent – Co-Principal Investigator[BR]
     3Christopher Small – Principal Investigator[[BR]]
     4Matthew Davy – Co-Principal Investigator [[BR]]
     5Dave Jent – Co-Principal Investigator [[BR]]
    66
    7 == Summary ==
     7= Summary =
    88
    9 * Measurement Manager deployed and demonstrated at GEC9
    10 * Asteri*x, SmartRE, and Pathlet demos deployed for GEC9 demos
    11 * Connection to NLR Openflow Core and multiple other campuses
    12 * Expedient and Opt-In manager deployed and controlling the IU Flowvisor instance
     9 * Measurement Manager deployed and demonstrated at GEC9
     10 * Asteri*x, SmartRE, and Pathlet demos deployed for GEC9 demos
     11 * Connection to NLR Openflow Core and multiple other campuses
     12 * Expedient and Opt-In manager deployed and controlling the IU Flowvisor instance
    1313
    1414= Major Accomplishments =