Changes between Version 4 and Version 5 of OFIU-2Q10Q3-status
- Timestamp:
- 01/10/11 22:46:49 (14 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
OFIU-2Q10Q3-status
v4 v5 1 1 = OpenFlow Campus Trials at Indiana University GEC9 Report = 2 2 3 Christopher Small – Principal Investigator[ BR]4 Matthew Davy – Co-Principal Investigator [BR]5 Dave Jent – Co-Principal Investigator [BR]3 Christopher Small – Principal Investigator[[BR]] 4 Matthew Davy – Co-Principal Investigator [[BR]] 5 Dave Jent – Co-Principal Investigator [[BR]] 6 6 7 = = Summary ==7 = Summary = 8 8 9 * Measurement Manager deployed and demonstrated at GEC9 10 * Asteri*x, SmartRE, and Pathlet demos deployed for GEC9 demos 11 * Connection to NLR Openflow Core and multiple other campuses12 * Expedient and Opt-In manager deployed and controlling the IU Flowvisor instance9 * Measurement Manager deployed and demonstrated at GEC9 10 * Asteri*x, SmartRE, and Pathlet demos deployed for GEC9 demos 11 * Connection to NLR Openflow Core and multiple other campuses 12 * Expedient and Opt-In manager deployed and controlling the IU Flowvisor instance 13 13 14 14 = Major Accomplishments =