wiki:OFI2

Version 3 (modified by matt@internet2.edu, 14 years ago) (diff)

--

Project Number

1774A

Project Title

GENI OpenFlow Backbone Deployment at Internet2
a.k.a. OFI2

Technical Contacts

PI: Eric Boyd eboyd@internet2.edu
Matt Zekauskas matt@internet2.edu

Participating Organizations

Internet2, Ann Arbor MI and Washington DC

GPO Liaison System Engineer

Josh Smift Josh Smift

Scope

Internet2 will implement Stage 0 of the Internet2 OpenFlow test network by creating a five node OpenFlow test network using small enterprise switches (HP ProCurve 5406 switches proposed, pending evaluation). The initial design has 10GE WAN interfaces, but that is subject to negotiation of the MOU Internet2 has with GENI for wide-area connectivity. Stage 0 comprises the appropriate OpenFlow controller(s), interfaces to connect several enterprise OpenFlow campuses, and interfaces to connect other projects such as ProtoGENI and SPP. The Stage 0 network will allow members and non-members of Internet2 to connect to GENI OpenFlow services.

Internet2 will create OpenFlow nodes in five cities: Atlanta, Chicago, Houston, New York, and Salt Lake City. Internet2 will also explore integrating the OpenFlow nodes with OpenFlow deployments on ProtoGENI nodes. In this second, complementary-to-ProtoGENI scenario, Internet2 will create OpenFlow nodes in five cities: Atlanta, Chicago, Los Angeles, New York, and Seattle.

Current Capabilities

Update this section as the project gains capabilities.

Milestones

MilestoneDate(OFI2: S2.a Complete initial deployment plan)?
MilestoneDate(OFI2: S2.b Lab test OpenFlow 1.0 capable switch and controller)?
MilestoneDate(OFI2: S2.c Deploy OpenFlow switches to five POPs)?
MilestoneDate(OFI2: S2.d Complete draft plan for integrating initial deployment with ProtoGENI)?
MilestoneDate(OFI2: S2.e Engineer and test regional network connections)?
MilestoneDate(OFI2: S2.f Provide access to OpenFlow slivers for testing)?
MilestoneDate(OFI2: S2.g Plan and engineer GEC 9 demo)?

Project Technical Documents

Quarterly Status Reports

Template: QuarterlyStatusReportTemplate

Due 2010-03-31: 2010-Q1 Status Report?

Spiral 2 Connectivity

Backbone Network Connectivity Diagram

When ready, attach the I2 backbone connectivity diagram as i2-backbone-connectivity.png, and link it in here.

Related Projects

OFSTAN
OFCLEM
OFGT
OFIU
OFPR
OFRG
OFUWA
OFUWI
OFNOX
EnterpriseGeni

OFI2
OFNLR

The OpenFlow switch Consortium
NOX
SNAC
FlowVisor
Deploying OpenFlow
Enterprise-GENI
E-GENI Aggregate Manager

Attachments (5)

Download all attachments as: .zip