Version 18 (modified by 15 years ago) (diff) | ,
---|
Project Number
1833A
Project Title
OpenFlow Campus Trials at Clemson University
a.k.a. OFCLEM
Technical Contacts
PI: Kuang-Ching Wang Kuang-Ching Wang
Jim Pepin pepin@clemson.edu
Dan Schmiedt willys@clemson.edu
Participating Organizations
Clemson University, Clemson SC
GPO Liaison System Engineer
Josh Smift Josh Smift
Scope
This project will deploy an OpenFlow testbed on the Clemson University campus and connect with wireless mesh access points and mobile terminals. This trial will conduct OpenFlow experimentation focused on OpenFlow enabled network operation solutions as a precursor to deployment into Clemson research and production networks.
Current Capabilities
ECE wireless lab test network
- Two OpenFlow VLANs (855 for production traffic, 898 for experimental traffic)
- Two OpenFlow access points on VLAN 898
- Two PlanetLab nodes on VLAN 855
- One OpenFlow switch (Toroki)
- FlowVisor, SNAC, and OpenRoads NOX controllers
Milestones
MilestoneDate(OFCLEM: S2.a1 Select vendors)?
MilestoneDate(OFCLEM: S2.a2 Purchase equipment)?
MilestoneDate(OFCLEM: S2.b Campus small deployments)?
MilestoneDate(OFCLEM: S2.c Install GENI software with AM API implementation)?
MilestoneDate(OFCLEM: S2.d Begin integration testing with Stanford and BBN)?
MilestoneDate(OFCLEM: S2.e Plan and engineer GEC 9 demo)?
MilestoneDate(OFCLEM: S2.f Upgrade small deployments to use OF 1.0)?
Project Technical Documents
Quarterly Status Reports
4Q09 Status Report
2010-Q1 Status Report
GEC
Clemson's slides from the OpenFlow meeting at GEC 7
Spiral 2 Connectivity
Campus Network Connectivity Diagram
Related Projects
OFSTAN
OFCLEM
OFGT
OFIU
OFPR
OFRG
OFUWA
OFUWI
OFNOX
EnterpriseGeni
The OpenFlow switch Consortium
NOX
SNAC
FlowVisor
Deploying OpenFlow
Enterprise-GENI
E-GENI Aggregate Manager
Attachments (15)
- 1833A-OFCLEM-Report-09Q4.pdf (199.3 KB) - added by 15 years ago.
-
clemson-connectivity.png (118.8 KB) - added by 15 years ago.
Clemson connectivity diagram
-
1833A-OFCLEM-Report-10Q1.pdf (16.9 KB) - added by 15 years ago.
2010 Q1 OFCLEM quarterly report
-
GEC7-openflow-meeting-slides-OFCLEM.pdf (810.1 KB) - added by 15 years ago.
Clemson's slides from the OpenFlow meeting at GEC 7
- 1833A-OFCLEM-Report-10Q2.pdf (13.5 KB) - added by 14 years ago.
- OF-Spiral2-Project-Review.pptx (196.2 KB) - added by 14 years ago.
- 1833A-OFCLEM-Report-10Q3.pdf (12.0 KB) - added by 14 years ago.
- GEC10-OF-campus-meeting-Clemson.pdf (1.3 MB) - added by 14 years ago.
-
1833A-OFCLEM-Report-post-GEC10.pdf (10.7 KB) - added by 14 years ago.
post GEC10 progress report
- 1833A-OFCLEM-Report-post-GEC11.pdf (10.4 KB) - added by 13 years ago.
- 1833A-OFCLEM-Report-post-GEC12.pdf (10.7 KB) - added by 13 years ago.
- 1833A-OFCLEM-Report-post-GEC13.pdf (14.3 KB) - added by 13 years ago.
- 1833A-OFCLEM-Report-post-GEC14.pdf (74.2 KB) - added by 12 years ago.
- 1833A-OFCLEM-Report-post-GEC15.pdf (71.0 KB) - added by 12 years ago.
- 1833A-OFCLEM-Report-post-GEC16.pdf (70.6 KB) - added by 12 years ago.