Version 1 (modified by 14 years ago) (diff) | ,
---|
Project Number
1833A
Project Title
Clemson University Trials of Enterprise GENI
a.k.a. OFCLEM
Technical Contacts
Principal Investigator: Kuang-Ching Wang Kuang-Ching Wang
Add any additional technical contacts here.
Participating Organizations
Clemson University, Clemson SC
GPO Liaison System Engineer
Josh Smift Josh Smift
Scope
This project will deploy an OpenFlow testbed on the Clemson University campus and connect with wireless mesh access points and mobile terminals. This trial will conduct OpenFlow experimentation focused on OpenFlow enabled network operation solutions as a precursor to deployment into Clemson research and production networks.
Current Capabilities
Update this section as the project gains capabilities.
Milestones
MilestoneDate(OFCLEM: S2.a Select vendors)?
MilestoneDate(OFCLEM: S2.b Campus small deployments)?
MilestoneDate(OFCLEM: S2.c Install GENI software with AM API implementation)?
MilestoneDate(OFCLEM: S2.d Begin integration testing with Stanford and BBN)?
MilestoneDate(OFCLEM: S2.e Plan and engineer GEC 9 demo)?
MilestoneDate(OFCLEM: S2.f Upgrade small deployments to use OF 1.0)?
Project Technical Documents
Add links to wiki pages as the project gains technical documents. Include any document in the working groups, as well as other useful documents.
Quarterly Status Reports
Due 2009-12-31: 2009-Q4 Status Report?
Spiral 2 Connectivity
Add links to wiki pages about details of infrastructure that the project is using, as it gets connected.
Related Projects
OFSTAN
OFGT
OFIU
OFPR
OFRG
OFUWI
OFUWA
OFNOX
Enterprise-GENI (@ OpenFlow wiki)
E-GENI Aggregate Manager (@ OpenFlow wiki)
Attachments (15)
- 1833A-OFCLEM-Report-09Q4.pdf (199.3 KB) - added by 14 years ago.
-
clemson-connectivity.png (118.8 KB) - added by 14 years ago.
Clemson connectivity diagram
-
1833A-OFCLEM-Report-10Q1.pdf (16.9 KB) - added by 14 years ago.
2010 Q1 OFCLEM quarterly report
-
GEC7-openflow-meeting-slides-OFCLEM.pdf (810.1 KB) - added by 14 years ago.
Clemson's slides from the OpenFlow meeting at GEC 7
- 1833A-OFCLEM-Report-10Q2.pdf (13.5 KB) - added by 14 years ago.
- OF-Spiral2-Project-Review.pptx (196.2 KB) - added by 14 years ago.
- 1833A-OFCLEM-Report-10Q3.pdf (12.0 KB) - added by 14 years ago.
- GEC10-OF-campus-meeting-Clemson.pdf (1.3 MB) - added by 13 years ago.
-
1833A-OFCLEM-Report-post-GEC10.pdf (10.7 KB) - added by 13 years ago.
post GEC10 progress report
- 1833A-OFCLEM-Report-post-GEC11.pdf (10.4 KB) - added by 13 years ago.
- 1833A-OFCLEM-Report-post-GEC12.pdf (10.7 KB) - added by 12 years ago.
- 1833A-OFCLEM-Report-post-GEC13.pdf (14.3 KB) - added by 12 years ago.
- 1833A-OFCLEM-Report-post-GEC14.pdf (74.2 KB) - added by 12 years ago.
- 1833A-OFCLEM-Report-post-GEC15.pdf (71.0 KB) - added by 11 years ago.
- 1833A-OFCLEM-Report-post-GEC16.pdf (70.6 KB) - added by 11 years ago.