Version 12 (modified by 15 years ago) (diff) | ,
---|
Project Number
1628
Project Title
Instrumentation and Measurement for GENI a.k.a. GENI Inst & Meas (obsolete), MeasurementSystem, MeasurementSys
Technical Contacts
PI Paul Barford / mailto:pb@cs.wisc.edu / 608 262 6609
Co-PI Mark Crovella / mailto:crovella@cs.bu.edu / 617 353 8923
Co-PI Joel Sommers / mailto:jsommers@colgate.edu / 315 228 7587
Participating Organizations
Computer Science Department
University of Wisconsin
1210 West Dayton St.
Madison, WI 53706
Computer Science Department
Boston University
111 Cummington St.
Boston, MA 02215
Computer Science Department
Colgate University
13 Oak Drive
Hamilton, NY 13346
Scope
The scope of work on this project is to develop, test and deploy a prototype implementation of network instrumentation and measurement systems for the GENI infrastructure.
Priority activities that contribute to this scope include the following items:
- Develop an instrumentation and measurement implementation for GENI that provides an interface for researchers, as well an interface to a GENI control framework.
- Develop an implementation that gives GENI users access to a shared measurement and instrumentation infrastructure that is extensible to several different kinds of measurement devices.
- Implement systems consistent with the GENI Instrumentation and Measurement Systems (GIMS) Specification, to help reduce risks in this as-yet-unimplemented area of GENI.
Milestones
MilestoneDate(MeasurementSys: System interface design specification -)?
MilestoneDate(MeasurementSys: Measurement system design specification -)?
MilestoneDate(MeasurementSys: Repository system design specification -)?
MilestoneDate(MeasurementSys: Basic instrumentation and measurement test suites -)?
MilestoneDate(MeasurementSys: Prototype with basic measurement functionality.)?
MilestoneDate(MeasurementSys: Basic functionality prototype available.)?
Project Technical Documents
Requirements and Specifications for the Instrumentation and Measurement Systems for GENI
Spiral 1 Connectivity
There is no deployment outside the PIs labs planned for Spiral 1. ProtoGENI is the control framework for integration.
The measurement devices being developed will be deployed on network links in the lab (taps or span ports on routers/switches). In the longer term (beyond the first year), measurement devices will be deployed in other labs and/or network locations. At this point, these devices will need IP addresses assigned so that they can be accessed by the control framework interface. The address may be private if the clearinghouse manages download and configuration as it would for a network node.
For Spiral 1, there is no requirement for layer 2 virtual ethernets to the project locations, although the measurement devices are aware of VLAN IDs. Longer-term requirements for VLANs are TBD.
Quarterly Status Reports
December 2008 Report
April 2009 Report
GPO Liason System Engineer
Related Projects
ProtoGENI cluster.
Attachments (15)
-
MeasurementSystem-QSR-Dec08.pdf (83.1 KB) - added by 16 years ago.
December 2008 Quarterly Status Report.
-
GIMS_conceptual_design.jpg (98.9 KB) - added by 16 years ago.
GIMS Conceptual Description.
-
MeasurementSysSpec.pdf (884.7 KB) - added by 16 years ago.
Requirements and Specification for an Instrumentation and Measurement System for GENI
-
GENI-GIMS-doc-review-jun09.txt (8.7 KB) - added by 15 years ago.
Notes from review of the "Requirements and Specifications for the Instrumentation and Measurement Systems for GENI" document
-
2010_04_29_GIMS_TODO.txt (6.6 KB) - added by 15 years ago.
GIMS GUI "To Do" List as of 2010-04-29
-
GIMSFig2010_03.jpg (684.1 KB) - added by 15 years ago.
Diagram of latest GIMS Configuration
- capd-06282010-alpha.tar.gz (2.8 MB) - added by 14 years ago.
- capture_system_poster.pdf (144.3 KB) - added by 14 years ago.
-
gims_control.tar (5.5 MB) - added by 14 years ago.
Tarball of the GIMS Control GUI and Aggregate Manager code.
-
gims_control2.tgz (3.6 MB) - added by 14 years ago.
Latest tarball of GIMS GUI, database, AM, and DB Admin tools.
-
GIMSOverview.docx (127.5 KB) - added by 14 years ago.
GIMS Capture System Overview
-
GPO Spiral 2 Project Review 8_30_10.pptx (260.2 KB) - added by 14 years ago.
GPO Spiral 2 Review Presentation
-
GIMS Update 11_2010.doc (286.5 KB) - added by 14 years ago.
GIMS Programming Project Update
-
GIMS Update 07_2011.doc (2.5 MB) - added by 13 years ago.
GIMS Project Update as of 07/2011
-
GIMSarchdiscussion.rtf (33.7 KB) - added by 13 years ago.
Architectural discussion and comparison of GIMS with emerging standards within I&M WG