Version 28 (modified by 10 years ago) (diff) | ,
---|
Project Number
1860
Project Title
MAXREGIONAL: GENI Optical Packet Switching Substrate a.k.a. MAXREGIONAL
Technical Contacts
PI: Tom Lehman tlehman@maxgigapop.net
Participating Organizations
University of Maryland / Mid-Atlantic Crossroads
GPO Liaison System Engineer
'GPO System Engineer:' Vicraj Thomas
Scope
The primary goal for this project during Spiral 4 is to design and demonstrate a prototype stitching service for GENI.
Current Capabilities
BRIEF descriptions of resources/functions/tools that are available to anyone in the GENI community
Milestones
Spiral 5
- MAXREGIONAL.S5.a Continue to support the stitching interoperation and testing between GENI Racks/Aggregates, and across network infrastructures such as Internet2 ION, AL2S, regional networks, and other networks that may be available for GENI stitching use. (https://wiki.maxgigapop.net/twiki/bin/view/GENI/Milestone-maxregional-yr3-s5a)
- MAXREGIONAL.S5.b Update the MAX Aggregate Manager to keep up to date with latest GENI AM APIs in use by other GENI Aggregates and GENI Experimenter tools. (https://wiki.maxgigapop.net/twiki/bin/view/GENI/Milestone-maxregional-yr3-s5b)
- MAXREGIONAL.S5.c Develop designs and prototype systems for facilitating and managing VLAN delegation by statically provisioned network regions. Work GPO and network providers to test and refine designs. (https://wiki.maxgigapop.net/twiki/bin/view/GENI/Milestone-maxregional-yr3-s5c)
Spiral 4
- MAXREGIONAL:S4.a Continue to support OpenFlow in MAX with a GENI aggregate that can connect GENI, MAX, and MAX members using OpenFlow. Make aggregate resources available to GENI experimenters.(1658) (October 2012) (https://wiki.maxgigapop.net/twiki/bin/view/GENI/Milestone-maxregional-yr2-s4a)
- MAXREGIONAL:S4.b Develop a prototype ION stitching service and demonstrate it at GEC16. Work with GENI architecture group to defined stitching RSPEC extensions and other common interfaces needed for stitching.(1658) (March 30, 2013) (https://wiki.maxgigapop.net/twiki/bin/view/GENI/Milestone-maxregional-yr2-s4b)
- MAXREGIONAL:S4.c Improve stitching service with additional development and integration, and conduct joint operational testing with early stitching participants in GENI (for example Internet2 and LONI). Demonstrate the operational service with operations participants at GEC17. (1658, 1860) (July 31, 2013) (https://wiki.maxgigapop.net/twiki/bin/view/GENI/Milestone-maxregional-yr2-s4c)
- MAXREGIONAL:S4.d Expand deployment of stitching service to additional GENI participants (regionals and campuses), continue development and integration improvements and support regular operations and changes in the GENI architecture standards during this period. (1860) (September, 2013) (https://wiki.maxgigapop.net/twiki/bin/view/GENI/Milestone-maxregional-yr2-s4d)
Old:
- MilestoneDate(MAXREGIONAL: S4.a Demonstration at GEC13)? (https://wiki.maxgigapop.net/twiki/bin/view/GENI/Milestone-maxregional-s4a) (complete)
- MilestoneDate(MAXREGIONAL: S4.b Demonstration at GEC14)? (https://wiki.maxgigapop.net/twiki/bin/view/GENI/Milestone-maxregional-s4b) (complete)
- MilestoneDate(MAXREGIONAL: S4.c Demonstration at GEC15)? (https://wiki.maxgigapop.net/twiki/bin/view/GENI/Milestone-maxregional-s4c) (complete)
Project Technical Documents
Links to wiki pages for the project's technical documents go here. List should include any document in the working groups, as well as other useful documents. Projects may have a full tree of wiki pages here. Quarterly Status Reports
POST GEC Status Reports
Due post each GEC
MAX GENI Status Report - GEC 13
MAX GENI and Stitching Status Report - GEC 14
MAX GENI Status Report - GEC 15
MAXREGIONAL GENI Status Report - GEC 17
MAXREGIONAL GENI Status Report - GEC 18
MAXREGIONAL GENI Status Report - GEC 19
GENIStitch GENI Status Report - GEC 19
Related Projects
Project-Name Includes non-GENI projects.