    2323'''Findings:'''
    2424 * Martin Swany gave a presentation on UNIS at RSpec Meeting at GEC10.  A general consensus has been reached that the ProtoGENI RSpec will be adopted as the general RSpec within GENI.  There was recognition of the fact that the core RSpec cannot currently represent all current and future use-cases and that the core specification should remain easily extensible using a namespacing extension mechanism.
    25  * Martin Swany served on the I&M WG panel.  No general consensus was reached.  The perfSONAR measurement schema was discussed as a likely contender to provide a common measurement representation across CFs.
     25 * Martin Swany served on the I&M WG panel.  The perfSONAR measurement schema was presented as a likely contender to provide a common measurement representation across CFs.
    2626[[BR]][[BR]]
    2727'''Activity:''' Network monitoring of the ProtoGENI backbone using perfSONAR.  [[BR]]
     
    3434'''Activity:''' Development of a perfSONAR-based I&M system for GENI experimenters. [[BR]]
    3535'''Findings: '''
    36  * The latest LAMP developments were presented at the GEC10 Demo Session
     36 * The latest LAMP developments and workflow were presented at the GEC10 Demo Session
    3737  * LAMP I&M "Portal" to control active and passive measurements
    3838  * Complete host monitoring
     
    4040  * Mapping measurements to interactive topology
    4141  * Cross-CM measurements with stitching between Utah and Kentucky nodes
     42
     43[[BR]][[BR]]
     44'''Activity:''' Promote perfSONAR on ProtoGENI and other clusters. [[BR]]
     45'''Findings: '''
     46 * Continued dialog with RENCI group about perfSONAR skeleton services
     47  * Discussed perfSONAR approach in meeting their specific measurement needs.
     48 * Met with other experimenters and discussed using LAMP/perfSONAR on ProtoGENI-based experiments.
    4249
    4350=== B. Project participants ===
     
    5360
    5461=== D. Outreach activities ===
    55  * Engaged w/ RENCI researchers on integrating measurement
    56 infrastructure into the LAMP perfSONAR Skeleton
    57  * Engaged with experimenters attending the 1st Doctoral Consortium
     62 * Engaged w/ RENCI researchers on integrating measurement infrastructure into the LAMP perfSONAR Skeleton
     63 * Engaged with experimenters attending the 1st Doctoral Consortium at GEC10
    5864  * Demonstrated and discussed the use of LAMP I&M within experiments
    5965