Changes between Version 24 and Version 25 of InstrumentationTools


Ignore:
Timestamp:
03/14/10 19:57:18 (15 years ago)
Author:
jwilliams@bbn.com
Comment:

Added milestone links for S1, updating page layout

Legend:

Unmodified
Added
Removed
Modified
  • InstrumentationTools

    v24 v25  
    1 '''Project Number'''
     1= Project Number =
    221642
    33
    4 '''Project Title'''
     4= Project Title =
    55
    66Instrumentation Tools for a GENI Prototype[[BR]]
    77a.k.a. INSTOOLS
    88
    9 '''Technical Contacts'''
     9== Technical Contacts ==
    1010
    1111Principal Investigator: James Griffioen griff@netlab.uky.edu[[BR]]
    1212Co-Principal Investigator: Zongming Fei fei@netlab.uky.edu
    1313
    14 '''Participating Organizations'''
     14== Participating Organizations ==
    1515
    1616[http://www.uky.edu/ University of Kentucky], Lexington, KY[[BR]]
    1717[http://www.netlab.uky.edu/index.htm Laboratory for Advanced Networking]
    1818
    19 '''Scope'''
     19== GPO Liaison System Engineer ==
     20Heidi Picher Dempsey hdempsey@geni.net
     21
     22== Scope ==
    2023
    2124The scope of work on this project is to create a GENI-enabled testbed based on the existing University of Kentucky Edulab, and to implement and to deploy instrumentation capabilities that will enable GENI users to better understand the runtime behavior of their experiments.
     
    3033[[Image(fig1low.jpg, 41%)]]
    3134
    32 '''The Kentucky Aggregate'''
     35== The Kentucky Aggregate ==
    3336
    3437An initial version of the Kentucky aggregate is up and running and was
     
    4447delay, etc.
    4548
    46 '''Accessing The Kentucky Aggregate'''
     49=== Accessing The Kentucky Aggregate ===
    4750
    4851The Kentucky [wiki:ProtoGENI] aggregate can be accessed by obtaining
     
    7881
    7982
    80 '''Milestones'''
     83== Milestones ==
    8184
    82 [[MilestoneDate(INSTOOLS: Upgrade UKY Emulab)]][[BR]]
    83 [[MilestoneDate(INSTOOLS: Develop Reference implementation of Aggregate Manager (AM v1.0))]] Milestone date was for first AM version, but work integrating the AM and ProtoGENI continues through Spiral 1.  Iniital integration with ProtoGENI demonstrated on 3/31 at GEC4.[[BR]]
    84 [[MilestoneDate(INSTOOLS: Integrate and Document Instrumentation Toolset)]][[BR]]
    85 [[MilestoneDate(INSTOOLS: Deploy AM and open UKY Edulab for GENI)]][[BR]]
     85=== Spiral 1 ===
    8686
    87 '''Project Technical Documents'''
     87[[MilestoneDate(INSTOOLS: S1.a Upgrade UKY Emulab)]][[BR]]
     88[[MilestoneDate(INSTOOLS: S1.b Develop Reference implementation of Aggregate Manager (AM v1.0))]] Milestone date was for first AM version, but work integrating the AM and ProtoGENI continues through Spiral 1.  Iniital integration with ProtoGENI demonstrated on 3/31 at GEC4.[[BR]]
     89[[MilestoneDate(INSTOOLS: S1.c Integrate and Document Instrumentation Toolset)]][[BR]]
     90[[MilestoneDate(INSTOOLS: S1.d Deploy AM and open UKY Edulab for GENI)]][[BR]]
    8891
    89 ''Papers:''
     92=== Spiral 2 ===
     93
     94== Project Technical Documents ==
     95
     96=== Papers ===
    9097
    9198J. Griffioen, Z. Fei, H. Nasir, [http://groups.geni.net/geni/attachment/wiki/InstrumentationTools/instools-design-doc.pdf Architectural Design and Specification of the INSTOOLS Measurement System], December 2009
    9299
    93 ''Presentations:''
     100=== Presentations ===
    94101
    95102[http://groups.geni.net/geni/attachment/wiki/presentations/GEC3_Kentucky.pdf Instrumentation Tools for a GENI Prototype], GEC3 Conference, 2008  (outlines the project goals and relationships with other projects).
     
    101108[http://groups.geni.net/geni/attachment/wiki/GEC6InstMeasWGAgenda/UK_IMWG_11-2009.pdf INSTOOLS: Instrumentation Tools for a ProtoGENI Prototype], GEC6 Conference, November 2009
    102109
    103 ''Wiki Pages:''
     110=== Wiki Pages ===
    104111
    105112[http://www.protogeni.net/trac/protogeni/wiki/UKYIntegration Integrating the Kentucky Instrumentation tools] into the ProtGENI project.
    106113
    107 ''Background Reading:''
     114=== Background Reading ===
    108115
    109116W. David Laverell, Zongming Fei, James N. Griffioen,
     
    112119
    113120
    114 '''Quarterly Status Reports'''
     121== Quarterly Status Reports ==
    115122
    116123[http://groups.geni.net/geni/attachment/wiki/InstrumentationTools/report.pdf 2008 Quarterly Report 1.  December 2008][[BR]]
     
    119126[http://groups.geni.net/geni/attachment/wiki/InstrumentationTools/report.3.pdf Quarterly Report 4. October 2009]
    120127
    121 '''Spiral 1 Connectivity'''
     128== Spiral 1 Connectivity ==
    122129
    123130IP Addresses/Layer 3:[[BR]]
     
    131138
    132139
    133 '''GPO Liaison System Engineer'''
    134 
    135 
    136 Heidi Picher Dempsey hdempsey@geni.net
    137 
    138 
    139 '''Related Work'''
     140== Related Work ==
    140141
    141142Collaborating with and using code from [wiki:ProtoGENI].