Changes between Version 3 and Version 4 of InstMeasTopic_4.3UseCasesInfrastructure
- Timestamp:
- 02/15/12 15:52:14 (13 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
InstMeasTopic_4.3UseCasesInfrastructure
v3 v4 3 3 = 4.3) I&M Use Cases for Infrastructure Measurement, and Support for Operators = 4 4 5 == 4.3.1) Goals == 5 == 1) Goals == 6 7 From Sec. 2 of the GENI I&M Architecture document: [[BR]] 8 9 In addition, the GENI operations staff require extensive and reliable instrumentation and measurement capabilities to monitor and troubleshoot the GENI suite and its constituent entities. Some of this data will be made available to experimenters, to help them conduct useful and repeatable experiments. [[BR]] 10 11 The GMOC, providing GENI-wide operator services, needs to monitor essentially all GENI infrastructure on a 24x7 basis. In this case, the GMOC Operator will gather, analyze and present MD that monitors hundreds of infrastructure elements. [[BR]] 12 13 14 == 2) Tasks == 6 15 7 16 Provide a concise but complete definition of I&M Use Cases for Infrastructure Measurement [[BR]] 8 17 9 I ncludethe support that should be available to operators [[BR]]18 Identify the support that should be available to operators [[BR]] 10 19 11 20 Update the [http://groups.geni.net/geni/wiki/GeniInstrumentationandMeasurementsArchitecture GENI I&M Architecture document]: [[BR]] … … 18 27 Use as guidance in the design of GENI I&M tools, particularly for the GEMINI and GIMI projects [[BR]] 19 28 20 == 4.3.2) Issues ==21 29 22 30 23 31 24 == 4.3.3) Team ==32 == 3) Team == 25 33 26 34 LEAD Martin Swany (Indiana U) [[BR]] 35 Guilherme Fernandes (?) [[BR]] 27 36 Eric Boyd (Internet2) [[BR]] 28 37 Jason Zurawski (Internet2) [[BR]] … … 30 39 Chris Small, for NetKarma (Indiana U) [[BR]] 31 40 Ilia Baldine, for ExoGENI racks (RENCI) [[BR]] 41 Jonathan Mills (RENCI) [[BR]] 32 42 ?, for InstaGENI racks (HP) [[BR]] 33 Luke Fowler?, for GMOC [[BR]]43 ?, for GMOC [[BR]] 34 44 Sarah Edwards (GPO) [[BR]] 35 45 Chaos Golubitski (GPO) [[BR]] 36 46 Harry Mussman (GPO) [[BR]] 37 47 38 == 4 .2.4) Meetings ==48 == 4) Meetings == 39 49 40 Review with operators at GEC13 [[BR]] 50 51 (organized calls or meetings before GEC13?) [[BR]] 41 52 42 == 4.2.5) Vision == 53 Review conclusions in pre-meeting at GEC13 43 54 44 From Sec. 2 of the GENI I&M Architecture document: [[BR]]55 Review with working team at GEC13 45 56 46 In addition, the GENI operations staff require extensive and reliable instrumentation and measurement capabilities to monitor and troubleshoot the GENI suite and its constituent entities. Some of this data will be made available to experimenters, to help them conduct useful and repeatable experiments. [[BR]] 47 48 The GMOC, providing GENI-wide operator services, needs to monitor essentially all GENI infrastructure on a 24x7 basis. In this case, the GMOC Operator will gather, analyze and present MD that monitors hundreds of infrastructure elements. [[BR]] 57 Review with operators, monitoring team at GEC13 [[BR]] 49 58 50 59 60 == 5) Issues == 51 61 52 == 4.2.6 Definition == 62 1) Identify which passive monitoring options are to be supported 63 2) Identify which event monitoring options are to be supported 64 3) Identify which active measurement options are to be supported 65 66 == 6) Definition == 53 67 54 68 Definition of infrastructure monitoring: [[BR]]