Changes between Version 3 and Version 4 of InstMeasTopic_4.3UseCasesInfrastructure


Ignore:
Timestamp:
02/15/12 15:52:14 (13 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • InstMeasTopic_4.3UseCasesInfrastructure

    v3 v4  
    33= 4.3)  I&M Use Cases for Infrastructure Measurement, and Support for Operators =
    44
    5 ==  4.3.1)  Goals ==
     5== 1)  Goals ==
     6
     7 From Sec. 2 of  the GENI I&M Architecture document:  [[BR]]
     8
     9  In addition, the GENI operations staff require extensive and reliable instrumentation and measurement capabilities to monitor and troubleshoot the GENI suite and its constituent entities.  Some of this data will be made available to experimenters, to help them conduct useful and repeatable experiments.   [[BR]]
     10
     11  The GMOC, providing GENI-wide operator services, needs to monitor essentially all GENI infrastructure on a 24x7 basis.  In this case, the GMOC Operator will gather, analyze and present MD that monitors hundreds of infrastructure elements.  [[BR]]
     12
     13
     14==  2)  Tasks ==
    615
    716 Provide a concise but complete definition of I&M Use Cases for Infrastructure Measurement [[BR]]
    817
    9  Include the support that should be available to operators  [[BR]]
     18 Identify the support that should be available to operators  [[BR]]
    1019
    1120 Update the [http://groups.geni.net/geni/wiki/GeniInstrumentationandMeasurementsArchitecture  GENI I&M Architecture document]:  [[BR]]
     
    1827 Use as guidance in the design of GENI I&M tools, particularly for the GEMINI and GIMI projects  [[BR]]
    1928
    20 == 4.3.2)  Issues ==
    2129
    2230 
    2331
    24 == 4.3.3)  Team ==
     32== 3)  Team ==
    2533 
    2634 LEAD  Martin Swany (Indiana U) [[BR]]
     35 Guilherme Fernandes  (?)  [[BR]]
    2736 Eric Boyd (Internet2) [[BR]]
    2837 Jason Zurawski (Internet2) [[BR]]
     
    3039 Chris Small, for NetKarma (Indiana U) [[BR]]
    3140 Ilia Baldine, for ExoGENI racks (RENCI) [[BR]]
     41 Jonathan Mills (RENCI)  [[BR]]
    3242 ?, for InstaGENI racks (HP) [[BR]]
    33  Luke Fowler?, for GMOC [[BR]]
     43 ?, for GMOC [[BR]]
    3444 Sarah Edwards (GPO) [[BR]]
    3545 Chaos Golubitski (GPO) [[BR]]
    3646 Harry Mussman  (GPO) [[BR]]
    3747
    38 == 4.2.4)  Meetings ==
     48== 4)  Meetings ==
    3949
    40  Review with operators at GEC13  [[BR]]
     50 
     51 (organized calls or meetings before GEC13?)  [[BR]]
    4152
    42 == 4.2.5)  Vision ==
     53 Review conclusions in pre-meeting at GEC13
    4354
    44  From Sec. 2 of  the GENI I&M Architecture document:  [[BR]]
     55 Review with working team at GEC13
    4556
    46   In addition, the GENI operations staff  require extensive and reliable instrumentation and measurement capabilities to monitor and troubleshoot the GENI suite and its constituent entities.  Some of this data will be made available to experimenters, to help them conduct useful and repeatable experiments.   [[BR]]
    47 
    48   The GMOC, providing GENI-wide operator services, needs to monitor essentially all GENI infrastructure on a 24x7 basis.  In this case, the GMOC Operator will gather, analyze and present MD that monitors hundreds of infrastructure elements.  [[BR]]
     57 Review with operators, monitoring team at GEC13  [[BR]]
    4958
    5059
     60== 5)  Issues ==
    5161
    52 == 4.2.6  Definition ==
     62 1) Identify which passive monitoring options are to be supported
     63 2) Identify which event monitoring options are to be supported
     64 3) Identify which active measurement options are to be supported
     65
     66== 6)  Definition ==
    5367
    5468 Definition of infrastructure monitoring:  [[BR]]