8 | | [wiki:InstMeasTopic_4.3UseCasesInfrastructure Work in Progress] [[BR]] |
| 7 | Provide a concise but complete definition of I&M Use Cases for Infrastructure Measurement [[BR]] |
| 8 | |
| 9 | Include the support that should be available to operators [[BR]] |
| 10 | |
| 11 | Update the [http://groups.geni.net/geni/wiki/GeniInstrumentationandMeasurementsArchitecture GENI I&M Architecture document]: [[BR]] |
| 12 | Sec. 3.1. I&M Use cases for Experimenters [[BR]] |
| 13 | Sec. 4.3.1 Type 1 I&M Service: Service Contained within a Slice [[BR]] |
| 14 | |
| 15 | Use as guidance in the design of GENI I&M tools, particularly for the GEMINI and GIMI projects [[BR]] |
| 16 | |
| 17 | == 4.3.2) Issues == |
| 18 | |
| 19 | 1) Can an Operator (e.g., GMOC) ever see MD owned by an Experimenter, e.g., to verify acceptable use of GENI resources or to troubleshoot problems in GENI infrastructure? If so, how? [[BR]] |
| 20 | |
| 21 | == 4.3.2) Team == |
| 22 | |
| 23 | LEAD Martin Swany (Indiana U) |
| 24 | Eric Boyd (Internet2) |
| 25 | Jason Zurawski (Internet2) |
| 26 | Prasad Calyam (Ohio Super Center) |
| 27 | Chris Small (Indiana U); Ilia Baldine, for ExoGENI racks (RENCI); ?, for InstaGENI racks (HP); ?, for GMOC [[BR]] |
| 28 | Harry Mussman (GPO) [[BR]] |
| 29 | |
| 30 | == 4.2.3) Meetings == |
| 31 | |
| 32 | Review with operators at GEC13 [[BR]] |
| 33 | |
| 34 | |