Changes between Version 41 and Version 42 of IMF


Ignore:
Timestamp:
05/25/11 14:59:38 (13 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • IMF

    v41 v42  
    4141[[BR]]
    4242
    43 [https://geni-imf.renci.org Project Website]
     43
    4444 
    4545=== Participating Organizations ===
     
    5050[https://ben.renci.org/  BEN:  Breakable Experimental Network][[BR]]
    5151
     52=== Related Projects ===
     53
     54[https://geni-imf.renci.org IMF Project Website] [[BR]]
     55
     56[wiki:ORCABEN  ORCA/BEN project] and [wiki:ORCAAUG  ORCA Augmentation][[BR]]
     57[http://www.net-silos.net/ The SILO Project][[BR]]
     58[https://ben.renci.org/  BEN:  Breakable Experimental Network][[BR]]
     59[http://www.cs.duke.edu/nicl/  New Internet Computing Lab (NICL)][[BR]]
     60[http://nicl.cod.cs.duke.edu/orca/  Open Resource Control Architecture (ORCA)][[BR]]
     61[http://www.cs.duke.edu/nicl/cereus/shirako.html  Shirako][[BR]]
     62[http://groups.geni.net/geni/wiki/Embedded%20Real-Time%20Measurements  Embedded Real-Time Measurements][[BR]]
     63[http://groups.geni.net/geni/wiki/LEARN LEARN: Programmable Measurements over Texas-based Research Network][[BR]]
    5264
    5365=== GPO Liaison System Engineer ===
     
    8294
    8395
    84 === Current Capabilities ===
     96== Operating Capabilities ==
    8597
    8698The overall architecture of the project has been articulated.  The first diagram below shows the experimenter view of the proposed system; realization of this is part of our Year 2 goals.  The second diagram below shows the component systems interaction architecture. [[BR]]
     
    92104[[Image(IMF_exp_view.png, 50%)]] [[BR]]
    93105
    94 === Architecture (as of July 2010) ===
     106=== Architecture (July 2010) ===
    95107
    96108[[Image(IMF_Arch.png, 50%)]] [[BR]]
     
    108120[[Image(High_QoS_Video_Demo.png, 40%)]] [[BR]]
    109121
    110 ==== Update (as of March, 2011) ====
     122=== Architecture Update (March, 2011) ===
    111123
    112124In line with the Spiral 3 goals of IMF, the architecture has been modified to include a pS MP to mediate the measurement from the Polatis switches, utilizing the ERM project capability which creates pS functionality into the switch, as shown in the diagram below.  The pS MP can continue to serve other pS clients, and the IMF client can use other mechanisms (such as that developed in Spiral 2) to obtain measurements, in addition to this.  This is shown in the diagram below.  The substrate control part is currently not shown, since this will require newer pS functionality to be available for integration.
     
    136148
    137149
     150=== Status Reports and Demos ===
    138151
    139 == Project Technical Documents ==
     152 * [http://groups.geni.net/geni/attachment/wiki/IMF/IMF-QSR1Q10.pdf Status ending 1st Quarter, 2010 ][[BR]]
     153 * [http://groups.geni.net/geni/attachment/wiki/IMF/IMF-QSR2Q10.pdf Status ending 2nd Quarter, 2010 ][[BR]]
     154 * (Starting Spiral 3 switching to "after-GEC" reporting cycle)[[BR]]
     155 * After GEC9 - No report, contract renewal still in negotiation[[BR]]
     156 * [wiki:IMF-GEC10-QSR]
     157 * [wiki:IMF-GEC11-QSR]
     158
     159=== Technical Documents ===
    140160
    141161[http://groups.geni.net/geni/attachment/wiki/IMF/GEC6-ilia-imf-intro.pdf Presentation at GEC6 ][[BR]]
     
    157177
    158178
    159 === Related Research Publications / Reports ===
    160179[http://groups.geni.net/geni/attachment/wiki/IMF/1569237337.pdf  "Architectural Support for Internet Evolution and Innovation"][[BR]]
    161180[http://groups.geni.net/geni/attachment/wiki/IMF/ants_silo.pdf  "A Composition Algorithm for the SILO Cross-Layer Optimization Service Architecture"][[BR]]
     
    164183[http://groups.geni.net/geni/attachment/wiki/IMF/paper.pdf  "A Unified Software Architecture to Enable Cross-Layer Design in the Future Internet"][[BR]]
    165184
    166 === Quarterly Status Reports ===
    167185
    168  * [http://groups.geni.net/geni/attachment/wiki/IMF/IMF-QSR1Q10.pdf Status ending 1st Quarter, 2010 ][[BR]]
    169  * [http://groups.geni.net/geni/attachment/wiki/IMF/IMF-QSR2Q10.pdf Status ending 2nd Quarter, 2010 ][[BR]]
    170  * (Starting Spiral 3 switching to "after-GEC" reporting cycle)[[BR]]
    171  * After GEC9 - No report, contract renewal still in negotiation[[BR]]
    172  * [wiki:IMF-GEC10-QSR]
    173  * [wiki:IMF-GEC11-QSR]
     186=== Software Releases ===
    174187
    175 === Spiral 2 Connectivity ===
     188
     189=== Connectivity ===
    176190
    177191See the [wiki:ORCABEN#Spiral2Connectivity  ORCA/BEN project]
    178192
    179193
    180 === Related Projects ===
    181194
    182 [wiki:ORCABEN  ORCA/BEN project] and [wiki:ORCAAUG  ORCA Augmentation][[BR]]
    183 [http://www.net-silos.net/ The SILO Project][[BR]]
    184 [https://ben.renci.org/  BEN:  Breakable Experimental Network][[BR]]
    185 [http://www.cs.duke.edu/nicl/  New Internet Computing Lab (NICL)][[BR]]
    186 [http://nicl.cod.cs.duke.edu/orca/  Open Resource Control Architecture (ORCA)][[BR]]
    187 [http://www.cs.duke.edu/nicl/cereus/shirako.html  Shirako][[BR]]
    188 [http://groups.geni.net/geni/wiki/Embedded%20Real-Time%20Measurements  Embedded Real-Time Measurements][[BR]]
    189 [http://groups.geni.net/geni/wiki/LEARN LEARN: Programmable Measurements over Texas-based Research Network][[BR]]