106 | 106 | In line with the Spiral 3 goals of IMF, the architecture has been modified to include a pS MP to mediate the measurement from the Polatis switches, utilizing the ERM project capability which creates pS functionality into the switch, as shown in the diagram below. The pS MP can continue to serve other pS clients, and the IMF client can use other mechanisms (such as that developed in Spiral 2) to obtain measurements, in addition to this. This is shown in the diagram below. The substrate control part is currently not shown, since this will require newer pS functionality to be available for integration. |