Changes between Version 26 and Version 27 of IMF


Ignore:
Timestamp:
04/01/11 11:21:06 (13 years ago)
Author:
Ilia Baldine
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • IMF

    v26 v27  
    9292=== Experiment View (Feb 2010) ===
    9393
    94 [[Image(IMF_exp_view.png, 90%)]] [[BR]]
     94[[Image(IMF_exp_view.png, 50%)]] [[BR]]
    9595
    9696=== Architecture (as of July 2010) ===
    9797
    98 [[Image(IMF_Arch.png, 80%)]] [[BR]]
     98[[Image(IMF_Arch.png, 50%)]] [[BR]]
    9999
    100100At the end of Spiral 2, we are ahead of our goals with respect to the main vision of the project, and have demonstrated real-time reactive use of optical substrate measurements to allow in-slice protocols to react by tuning optical substrate parameters.  A detailed description is available in the GEC8 demo report.  The diagram below shows the essentials of the demo setup.
     
    102102The IMF project uses the BEN facility for its physical realization.  See the [wiki:ORCABEN#CurrentCapabilities ORCA/BEN project] .
    103103
    104 [[Image(GEC8_demo_nutshell.png, 80%)]] [[BR]]
     104[[Image(GEC8_demo_nutshell.png, 50%)]] [[BR]]
    105105
    106106==== Update (as of March, 2011) ====
     
    108108In line with the Spiral 3 goals of IMF, the architecture has been modified to include a pS MP to mediate the measurement from the Polatis switches, utilizing the ERM project capability which creates pS functionality into the switch, as shown in the diagram below.  The pS MP can continue to serve other pS clients, and the IMF client can use other mechanisms (such as that developed in Spiral 2) to obtain measurements, in addition to this.  This is shown in the diagram below.  The substrate control part is currently not shown, since this will require newer pS functionality to be available for integration.
    109109
    110 [[Image(pS_blowup.pdf, 80%)]] [[BR]]
     110[[Image(pS_blowup.pdf, 50%)]] [[BR]]
    111111
    112112=== Milestones ===