Changes between Version 6 and Version 7 of IMF-GEC10-QSR


Ignore:
Timestamp:
04/11/11 10:48:08 (13 years ago)
Author:
Rudra Dutta
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • IMF-GEC10-QSR

    v6 v7  
    66
    77= Overview =
     8
     9This wiki page serves as the Status Report following GEC10 for the IMF project.
     10
     11 * Draft created by Rudra Dutta on March 22, 2011
     12 * Modified by Rudra Dutta March 22 - April ? 2011
     13 * Final version released April ? 2011
     14
     15Upon consultation with GPO, the priorities of the project were revisited for Year 2 of this project. As a result, Year 2 (Spiral 3) goals were focused on integrating the developed IMF capabilities for measurement, and transfer of measurement (from substrate to in-slice stack), with existing GENI Inst&Meas capabilities; specifically, to integrate and install perfSONAR (pS) MPs and archives to collect performance measurement data from Polatis switches and Infinera DWDM platforms on 4 BEN sites, and (subsequently) integrate pS MP polling, or adopt other GENI I&M capabilities, into IMF to mediate the ability of in-slice reactive protocols to communicate back to actuators in the substrate.
     16
     17At GEC10, the first of these (collecting performance data from Polatis using pS) capability has been completed. This leverages Spiral 3 goals of the ERM project team, who also form the Columbia U part of the IMF team.
    818
    919= Major Accomplishments =
     
    2434= Description of work performed during last quarter =
    2535
     36 IMF project deliverables for this first part of Spiral 3 consist of:
     37
     38 * Integrating ...
     39
    2640== Activities and Findings ==
     41
     42...
    2743
    2844== Project Participants ==
     
    5268== Documentation and Release Notes ==
    5369
     70...
     71
    5472[[Image(PubSub_PerfSONAR_Source_Code_Folder_Structure.png, 50%)]] [[BR]][[BR]][[BR]]
    5573
     
    5775
    5876== Code Snapshot ==
     77
     78...