Changes between Version 52 and Version 53 of GpoDoc


Ignore:
Timestamp:
03/16/11 14:33:52 (13 years ago)
Author:
hdempsey@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • GpoDoc

    v52 v53  
    2020  ''This document communicates common guidelines for using the suite of GENI infrastructures to the GENI community.  GENI participants should be willing to follow the guidelines, and to support GENI community efforts to implement this policy.''[[BR]]
    2121  http://groups.geni.net/geni/attachment/wiki/RUP/RUP.pdf (updated 3/10/09)[[BR]]
    22   This document has a wiki page at [wiki:RUP].  This document was reviewed by the OMIS working group (see [wiki:GeniOmisGEC4]), and is adopted for use in GENI Spiral 2.
     22  This document has a wiki page at [wiki:RUP].  This document was reviewed and approved by the OMIS working group (see [wiki:GeniOmisGEC4]), and is adopted for use in GENI Spiral 2.
    2323
    2424=== GENI Aggregate Provider's Agreement ===
     
    3030Management Authorities (MAs), providing aggregates and components operating as a part of GENI, are well-served by having a common set of principles to establish an expected level of service, and methods of cooperation. Such principles, presented in this agreement, benefit the security and stability of the entire GENI suite of infrastructures."
    3131
    32 This document was reviewed by the OMIS working group (see [wiki:Gec9COMISAgenda]), and is adopted for use in GENI Spiral 3.
     32This document was reviewed and approved by the COMIS working group (see [wiki:Gec9COMISAgenda]), and is adopted for use in GENI Spiral 3.
     33
     34=== Emergency Stop Procedure ===
     35
     36http://groups.geni.net/geni/attachment/wiki/GENIMetaOpss/Emergency_Stop_System_Description_v5.1.doc
     37[[BR]]
     38"One of the essential early operational requirements for the GENI facility is the need to manage and coordinate the stop and/or containment of GENI resources among all GENI projects in the case of an urgent request.  Emergency stop is the system used to respond to incidents of interference or resource exhaustion caused either unintentionally (misconfiguration), or intentionally (malware).  This is intended to protect GENI aggregates when they begin to integrate with other aggregates, and when GENI begins to interconnect with outside networks.
     39
     40For Spiral 2, GENI aggregates will have active experimentation and increased integration and interconnection with other aggregates or non-GENI networks.  This document will provide an approach for an early emergency stop service in Spiral 2, as well as a potential evolution for emergency stop for future spirals."
     41
     42This document was reviewed and approved by the OMIS working group (see [wiki:Gec8OmisAgenda]), and is adopted for use in GENI Spiral 2 and 3.
    3343
    3444----