Version 62 (modified by 14 years ago) (diff) | ,
---|
Project Number
1595
Project Title
GpENI: Great Plains Environment for Network Innovation
Technical Contacts
Principal Investigator: James P.G. Sterbenz, The University of Kansas, jpgs@ittc.ku.edu
Co-PI: Deep Medhi, University of Missouri – Kansas City, dmedhi@umkc.edu
Co-PI: Byrav Ramamurthy, University of Nebraska – Lincoln, byrav@cse.unl.edu
Co-PI: Caterina Scolio, Kansas State University, caterina@ksu.edu
Co-PI: Don Gruenbacher, Kansas State University, grue@ksu.edu
Co-PI: Greg Monaco at Great Plains Network, greg@greatplains.net
Co-PI: Jeff Verrant, Ciena, jverrant@ciena.com
Co-PI: Cort Buffington, KanREN, cort@kanren.net
Co-PI: TBD, Qwest
Co-PI: David Hutchison, Lancaster University, dh@comp.lancs.ac.uk
Co-PI: Bernhard Platter, ETH Zürich, plattner@tik.ee.ethz.ch
Co-I: Joseph B. Evans, The University of Kansas, evans@eecs.ku.edu
Co-I: Rick McMullen, The University of Kansas, mcmullend@ku.edu
Co-I: Baek-Young Choi, University of Missouri – Kansas City, choiby@umkc.edu
Co-I: Jim Archuleta, Ciena, jarchule@ciena.com
Co-I: Andrew Scott, Lancaster University, acs@comp.lancs.ac.uk
Participating Organizations
The University of Kansas – Lawrence, KS
Kansas State University – Manhattan, KS
University of Missouri – Kansas City, MO
University of Nebraska – Lincoln, NE
Great Plains Network
Ciena Governement Solutions – Des Moines, IA
Qwest Government Services - Fairfax, VA
KanREN – Lawrence, KS
MOREnet – Columbia, MO
Lancaster University, United Kingdom
ETH Zürich, Switzerland
Scope
- Lead the integration of the Princeton control framework onto the GpENI testbed.
- Enable backbone connection (Internet2/NLR) supporting end-to-end VLAN connections into the GpENI testbed.
- Make GpENI infrastructure running Princeton control framework available to external researchers over VLAN connections by the end of year 1.
- Present GpENI integration and operational status to the various control frameworks selected in Spiral 1 through active participation in GEC meetings and the appropriate working groups
Current Capabilities
Milestones
MilestoneDate(GpENI: Testbed available for limited external research)?
- 04 Apr 2009 – Million node GENI (Seattle) is deployed on GpENI PlanetLab nodes
MilestoneDate(GpENI: Delivery of component manager ICD for Ciena Core Director switch)?
MilestoneDate(GpENI: Contribute to GENI outreach)? on-going
MilestoneDate(GpENI: 2.a new geniwrapper)?
MilestoneDate(GpENI: 2.b study DCN in GpENI)?
MilestoneDate(GpENI: 2.c tools)?
MilestoneDate(GpENI: 2.d access)?
MilestoneDate(GpENI: 2.e VINI)?
MilestoneDate(GpENI: 2.f MAX)?
MilestoneDate(GpENI: 2.g deploy DCN in GpENI)?
MilestoneDate(GpENI: 2.h 2nd Ciena switch)?
MilestoneDate(GpENI: 2.i web-portal)?
MilestoneDate(GpENI: 2.j federate)?
MilestoneDate(GpENI: 2.k XORP and VINI)?
MilestoneDate(GpENI: 2.l DCN GpENI MAX)?
MilestoneDate(GpENI: 2.m security)?
MilestoneDate(GpENI: 2.n outreach)?
Project Technical Documents
Link to GpENI wiki maintained by KU https://wiki.ittc.ku.edu/gpeni
Quarterly Status Reports
4Q08 Status Report
1Q09 Status Report
2Q09 Status Report copy downloaded 07-08-2009
or Link to Status Reports on GpENI wiki
Spiral 1 Connectivity
The GpENI network is formed from the Great Plains Network which has equipment co-located at an Internet2 POP in Kansas City, MO. The connections between the DWDM equipment, the availability of the 10GBE switch and the connections to the I2 transport network are to be determined. Contact James Sterbenz for status updates.
The Ciena switches are scheduled for acquisition over the three year period of performance (spiral-1 plus 2 option years). The initial switch to be purchased in spiral-1 is the Ciena Core Director located at The University of Nebraska-Lincoln (UNL).
GPO Liaison System Engineer
Christopher Small
Related Projects
none currently listed
Attachments (12)
- GpENI Network Map.pdf (27.7 KB) - added by 15 years ago.
- GpENI 4Q08 QSR.doc (71.5 KB) - added by 15 years ago.
- GpENI 1Q09 QSR.doc (46.5 KB) - added by 15 years ago.
-
Quarterly Reports - GpENI.pdf (202.5 KB) - added by 14 years ago.
2Q09 Status Report
- Quarterly Reports - GpENI.2.pdf (196.4 KB) - added by 14 years ago.
- ION_in_GpENI_Investigation_Report.pdf (749.2 KB) - added by 14 years ago.
-
MAX-GpENI-interconnection.pdf (595.7 KB) - added by 14 years ago.
Options for interconnecting GpENI with MAX.
-
GpENI-2009-dec.pdf (283.2 KB) - added by 14 years ago.
QSR - 4Q 2009
-
GpENI-2010-mar.pdf (306.0 KB) - added by 14 years ago.
QSR - 1Q 2010
-
GpENI-2010-jun.pdf (179.8 KB) - added by 13 years ago.
Quarterly Status Report --- June 2010
-
GpENI-Spiral-2-review.ppt (154.3 KB) - added by 13 years ago.
Spiral 2 review presentation.
-
GENI deliverable on Openflow.pdf (285.1 KB) - added by 12 years ago.
Deliverable for Milestone S3.d.