Version 27 (modified by 16 years ago) (diff) | ,
---|
Project Number
1595
Project Title
GpENI: Great Plains Environment for Network Innovation
Technical Contacts
Principal Investigator: James P.G. Sterbenz jpgs@ittc.ku.edu
Co-PI: Deep Medhi at University of Missouri -- Kansas City
Co-PI: Byrav Ramamurthy at University of Nebraska -- Lincoln
Co-PI: Caterina Scolio and Don Gruenbacher at Kansas State University
Co-PI: Greg Monaco at Great Plains Network
Co-PI: Jeff Verrant at Ciena
Co-PI: TBD at Qwest
Co-I: Joseph B. Evans evans@eecs.ku.edu
Participating Organizations
The University of Kansas – Lawrence, KS
Kansas State University – Manhattan, KS
University of Missouri – Kansas City, MO
University of Nebraska – Lincoln, NE
Great Plains Network
Ciena Governement Solutions – Des Moines, IA
Qwest Government Services - Fairfax, VA
KanREN – Lawrence, KS
MOREnet – Columbia, MO
Scope
To provide an edge software defined routing infrastructure connected over a Regional Optical Network (RON) with GENI access to core optical switching equipment. GpENI belongs to the PlanetLab cluster (B).
Milestones
GpENI: Purchase switch and complete end-to-end connections
- 01 Nov 2008 – KU node cluster installed
- UNL optical switch installed
- 13 Feb 2009 – UNL to I2 to KU connectivity established
- 27 Feb 2009 – KU node cluster online
- 04 Mar 2009 – KSU node cluster online
- 11 Mar 2009 – UNL node cluster online
GpENI: Integrate GpENI with PlanetLab control framework
- 04 Mar 2009 – GpENI running PlanetLab control framework at KSU
- 09 Mar 2009 – KU attached to KSU PLC; KU–KSU slice created
- 17 Mar 2009 – UNL attached to KSU PLC; KU–KSU–UNL slice created
GpENI: Testbed available for limited external research
GpENI: Delivery of component manager ICD for Ciena Core Director switch
GpENI: Contribute to GENI outreach
Project Technical Documents
Link to GpENI wiki maintained by KU https://wiki.ittc.ku.edu/gpeni
Quarterly Status Reports
4Q08 Status Report or Link to 4Q08 Status Report on GpENI wiki
Spiral 1 Connectivity
The GpENI network is formed from the Great Plains Network which has equipment co-located at an Internet2 POP in Kansas City, MO. The connections between the DWDM equipment, the availability of the 10GBE switch and the connections to the I2 transport network are to be determined. Contact James Sterbenz for status updates.
The Ciena switches are scheduled for acquisition over the three year period of performance (spiral-1 plus 2 option years). The initial switch to be purchased in spiral-1 is the Ciena Core Director located at The University of Nebraska-Lincoln (UNL).
GPO Liason System Engineer
John Jacob jjacob@geni.net
Related Projects
none currently listed
Attachments (12)
- GpENI Network Map.pdf (27.7 KB) - added by 16 years ago.
- GpENI 4Q08 QSR.doc (71.5 KB) - added by 16 years ago.
- GpENI 1Q09 QSR.doc (46.5 KB) - added by 16 years ago.
-
Quarterly Reports - GpENI.pdf (202.5 KB) - added by 15 years ago.
2Q09 Status Report
- Quarterly Reports - GpENI.2.pdf (196.4 KB) - added by 15 years ago.
- ION_in_GpENI_Investigation_Report.pdf (749.2 KB) - added by 15 years ago.
-
MAX-GpENI-interconnection.pdf (595.7 KB) - added by 15 years ago.
Options for interconnecting GpENI with MAX.
-
GpENI-2009-dec.pdf (283.2 KB) - added by 15 years ago.
QSR - 4Q 2009
-
GpENI-2010-mar.pdf (306.0 KB) - added by 15 years ago.
QSR - 1Q 2010
-
GpENI-2010-jun.pdf (179.8 KB) - added by 14 years ago.
Quarterly Status Report --- June 2010
-
GpENI-Spiral-2-review.ppt (154.3 KB) - added by 14 years ago.
Spiral 2 review presentation.
-
GENI deliverable on Openflow.pdf (285.1 KB) - added by 13 years ago.
Deliverable for Milestone S3.d.