52 | | [[MilestoneDate(GpENI: Purchase switch and complete end-to-end connections)]] |
53 | | * 10 Oct 2008 – UNL Core Director delivered |
54 | | * 01 Nov 2008 – KU node cluster installed |
55 | | * 19 Dec 2008 – UNL optical switch operational |
56 | | * 13 Feb 2009 – UNL to I2 to KU connectivity established |
57 | | * 27 Feb 2009 – KU node cluster online |
58 | | * 04 Mar 2009 – KSU node cluster online |
59 | | * 11 Mar 2009 – UNL node cluster online |
60 | | * 27 Mar 2009 – Temporary L2TPv3 tunnel to UMKC relatively stable (will be replaced when MOREnet optical infrastructure when available) |
61 | | * 30 Mar 2009 – milestone met |
62 | | * 25 Jun 2009 – discussions begun to interconnect with ProtoGENI |
63 | | * 26 Jun 2009 – discussions begun to interconnect with MAX |
64 | | * 29 Jun 2009 - UMKC is now fully connected through MOREnet optical infrastructure |
65 | | * 10 Jul 2009 – Lancaster node cluster installed |
66 | | * 16 Jul 2009 – Lancaster L2TPv2 tunnel established |
67 | | |
68 | | [[MilestoneDate(GpENI: Integrate GpENI with PlanetLab control framework)]][[BR]] |
69 | | * 04 Mar 2009 – GpENI running PlanetLab control framework at KSU |
70 | | * 09 Mar 2009 – KU attached to KSU PLC; KU–KSU slice created |
71 | | * 17 Mar 2009 – UNL attached to KSU PLC; KU–KSU–UNL slice created |
72 | | * 25 Mar 2009 – KSU GpENI dynamic operational status page available: http://control-1.ksu.gpeni.net/gec4/ |
73 | | * 27 Mar 2009 – UMKC node attached to KSU PLC; slice across all four GpENI node clusters created |
74 | | * 30 Mar 2009 – milestone met |
75 | | * 01 Apr 2009 – [http://groups.geni.net/geni/wiki/GushProto Gush] is running on GpENI |
76 | | * 16 Apr 2009 – UNL ported DCN to Netgear GSM7224 (bandwidth limits not supported) |
77 | | * 21 May 2009 – Netgear GSM7224 port included in DCN codebase: https://wiki.internet2.edu/confluence/display/DCNSS/DRAGON+Supported+Switches |
78 | | * 23 Jun 2009 – KSU trying GENIwrapper |
79 | | * 29 Jun 2009 – UMKC completed initial local testing of VINI-Central set up for GpENI |
80 | | * 14 Jul 2009 – GENIwrapper 0.8-4 is now running in PlanetLab control aggregate |
81 | | * 15 Jul 2009 – MyVINI@GpENI central (with MyPLC 4.3) is installed and is now running at UMKC -- this is GENIwrapper compatible |
82 | | * 15 Jul 2009 – GpENI-VINI clients (router-1 & router-2) are up and running at UMKC |
83 | | * 16 Jul 2009 - GpENI-VINI client (router-1) is up and running at UNL |
84 | | * 17 Jul 2009 - GpENI-VINI clients (router-1 & router-2) are up and running at KU |
85 | | |