    4141'''Milestones'''[[BR]]
    42 [milestone:"GpENI: Purchase switch and complete end-to-end connections"]
     42
     43[[MilestoneDate(GpENI: Purchase switch and complete end-to-end connections)]]
    4344 * 10 Oct 2008 – UNL Core Director delivered
    4445 * 01 Nov 2008 – KU node cluster installed
     
    5455 * 29 Jun 2009 - UMKC is now fully connected through MOREnet optical infrastructure
    5556
    56 [milestone:"GpENI: Integrate GpENI with PlanetLab control framework"][[BR]]
    57 
     57[[MilestoneDate(GpENI: Integrate GpENI with PlanetLab control framework)]][[BR]]
    5858 * 04 Mar 2009 – GpENI running PlanetLab control framework at KSU
    5959 * 09 Mar 2009 – KU attached to KSU PLC; KU–KSU slice created
     
    6868 * 29 Jun 2009 – UMKC completed initial local testing of VINI-Central set up for GpENI 
    6969
    70 [milestone:"GpENI: Testbed available for limited external research"] Due 15Oct09 [[BR]]
    71 
     70[[MilestoneDate(GpENI: Testbed available for limited external research)]][[BR]]
    7271 * 04 Apr 2009 – [http://groups.geni.net/geni/wiki/MillionNodeGENI Million node GENI (Seattle)] is deployed on GpENI PlanetLab nodes
    7372
    74 [milestone:"GpENI: Delivery of component manager ICD for Ciena Core Director switch"] Due 15Oct09[[BR]]
    75 [milestone:"GpENI: Contribute to GENI outreach"] on-going [[BR]]
     73[[MilestoneDate(GpENI: Delivery of component manager ICD for Ciena Core Director switch)]][[BR]]
     74[[MilestoneDate(GpENI: Contribute to GENI outreach)]] on-going [[BR]]
    7675