Changes between Version 23 and Version 24 of GeniNetworkStitchingTestStatus/Resources


Ignore:
Timestamp:
06/11/13 13:26:12 (11 years ago)
Author:
lnevers@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • GeniNetworkStitchingTestStatus/Resources

    v23 v24  
    1111||Scenario 2 (Utah IG to Utah PG) ||[[Color(red,Fail)]]           ||   #1044        ||Single slice with multiple stitched VLANs||
    1212||Scenario 2 (Utah IG to GPO IG)  ||                              ||                ||Single slice with multiple stitched VLANs||
    13 ||Scenario 3 (Utah IG to GPO IG)  ||                              ||                ||                ||
    14 ||Scenario 3 (Utah IG to Utah PG) ||[[Color(green,Pass)]]         ||                ||                ||
    15 ||Scenario 4 (Utah IG to GPO IG)  ||                              ||                ||                ||
    16 ||Scenario 4 (Utah IG to Utah PG) ||                              ||                ||                ||
    17 ||Scenario 5 (IG Utah to PG Utah to IG GPO)|| [[Color(red,Fail)]] || #1047          ||                ||
     13||Scenario 3 (Utah IG to GPO IG)  ||                              ||                ||Multiple slices with 1 stitched VLAN each||
     14||Scenario 3 (Utah IG to Utah PG) ||[[Color(green,Pass)]]         ||                ||Multiple slices with 1 stitched VLAN each||
     15||Scenario 4 (Utah IG to GPO IG)  ||                              ||                ||Multiple slices with multiple stitched VLANs each||
     16||Scenario 4 (Utah IG to Utah PG) ||                              ||                ||Multiple slices with multiple stitched VLANs each||
     17||Scenario 5 (IG Utah to PG Utah to IG GPO)|| [[Color(red,Fail)]] || #1047          ||Single 3 nodes linear slice with multiple stitched VLAN hops||
     18
    1819[[BR]]
    1920|| '''State Legend'''                     || '''Description'''                                                    ||
     
    11941195   * slice2 includes: (Aggr1<->VLAN3<->Aggr2) + (Aggr1<->VLAN4<->Aggr2)
    11951196
    1196 == Scenario 5 - Three node linear ==
     1197== Scenario 5 - Single 3 nodes linear slice with multiple stitched VLAN hops ==
     1198
    11971199  * Slice 1 included: (IG Utah <-link1-> PG Utah <-link via ION/I2-> IG GPO)
    11981200