1393 | | Verified Stitching Path support for ''multiple point-to-point'' paths by having 2 concurrent stitched slivers (ln-ext1, ln-ext2) from Utah InstaGENI to GPO InstaGENI. Set up first sliver (ln-ext1) and logged into endpoint hosts to send ping traffic. Left pings running and created the second sliver (ln-ext2). Second sliver started without any problem and started pings between end-points. Left both experiments running for 1 hour. |
| 1393 | Verified Stitching Path support for ''multiple point-to-point'' paths by having 2 concurrent stitched slivers (ln-ext1, ln-ext2) from Utah InstaGENI to GPO InstaGENI. Set up first sliver (ln-ext1) and logged into endpoint hosts to send ping traffic. Left pings running and created the second sliver (ln-ext2). Second sliver started without any problem and started pings between end-points. Left both experiments running for 1 hour. Was able to renew sliver and get sliver status on both experiments. |
| 1394 | |
| 1395 | Additionally,verified Stitching Path support for ''multiple point-to-point'' paths by having 1 experiment with with multiple paths (2 links) from Utah InstaGENI to GPO InstaGENI. XXXXX |