Changes between Version 13 and Version 14 of GeniNetworkStitchingConfirmationTests


Ignore:
Timestamp:
07/28/14 11:34:48 (10 years ago)
Author:
lnevers@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • GeniNetworkStitchingConfirmationTests

    v13 v14  
    1515A stitching test between the new site and the GPO IG rack will be performed for each network path available at the new site.  For example, if the site is connected to both ION and AL2S, two separate tests will be run to verify that both paths can be requested and used between the two Xen VMs at each site. This is the ION topology that will be verified:
    1616
    17 [[Image(IG-ST-1-ion.jpg)]]
     17  [[Image(IG-ST-1-ion.jpg)]]
    1818
    1919If the New IG site is connected to AL2S, then it will be connected to another AL2S site first to verify basic connectivity:
    2020
    21 [[Image(IG-ST-1-al2s.jpg)]]
    22 
     21  [[Image(IG-ST-1-al2s.jpg)]]
     22 
    2323Once basic AL2S connectivity it verified, the New IG site is then connected via AL2S and ION to the the GPO IG site as shown in the following topology:
    2424
    25 [[Image(IG-ST-1-al2s-ion.jpg)]]
     25  [[Image(IG-ST-1-al2s-ion.jpg)]]
    2626
    2727