wiki:GeniNetworkStitchingConfirmationTestStatus

Version 365 (modified by lnevers@bbn.com, 7 years ago) (diff)

--

New Site Stitching Confirmation Tests Status

This page captures the status for InstaGENI (IG), ExoGENI (EG) and OpenGENI (OG) GENI network stitching sites. Tests are defined in the New Site Stitching Confirmation Tests page. For a full list of available site see the GENI Network Stitching sites page.

Site Status

Undergoing Confirmation Tests:

University of Hawaii, University of Florida, George Washington University, Pittsburgh Supercomputing Center, University of Alaska, University of Massachusetts, University of Northern Florida, Florida International University, Wayne State University, Utah Stitching Aggregate, University of Utah CloudLab, Texas A & M University EG,

Completed Stitching Confirmation Tests successfully: (32 sites)

Northwestern University, Case Western Reserve University, CENIC IG, Clemson University IG, Georgia Tech IG, University of Kansas IG, University of California - Los Angeles IG, Rutgers IG, University of Chicago IG, University of Illinois IG, MAX IG, NPS IG, NYSERNet IG, SOX IG, Stanford University IG, University of Kentucky IG, University of Kentucky MCV IG, University of Kentucky PKS2 IG, University of Michigan, University of Missouri IG, University of Missouri Kansas City IG, University of Tennesse - Chattanooga IG, University of Washington IG, University of Wisconsin IG, Clemson OG, GPO OG

There are 6 additional sites that were validated as part of the initial GENI Network Stitching Validation that have no test details on this page:

GPO ExoGENI, GPO InstaGENI, University of Kentucky ProtoGENI, University of Utah Downtown Data Center InstaGENI, University of Utah InstaGENI, and University of Utah ProtoGENI.

Status Legend

Overall Site Status may be one of the following:

  • Pass - Site confirmation tests completed successfully and site is ready for Experimenters.
  • Pass: most criteria - Site partially confirmed with documented exceptions.
  • Blocked - Site confirmation tests blocked by tracked issue.
  • In Progress - Site confirmation tests in progress.

Individual Stitching Confirmation Test Status may be one of the following:

Test Detail List


Case Western Reserve University

InstaGENI Site Status: Pass
Stitching Confirmation Tests Logs: here
Stitching Request RSpecs: here

Test AL2S State Al2S CompletedNotes
IG-ST-1 New Site to GPO IG Color(green,Pass)? 2015-02-20
IG-ST-2 Loop topology Color(green,Pass)? 2015-02-20
IG-ST-3 Linear topology Color(green,Pass)? 2015-02-20
IG-ST-4 New Site to GPO EGColor(green,Pass)? 2015-02-20
IG-ST-5 Site Information Color(green,Pass)? 2015-02-20
IG-ST-6 OpenFlow topology Color(green,Pass)? 2015-02-20

CENIC

InstaGENI Site Status: Pass
Stitching Confirmation Tests Logs: here
Stitching Request RSpecs: here

Test AL2S State Date Completed Tickets Notes
IG-ST-1 New Site to GPO IG Color(green,Pass)?2015-01-08
IG-ST-2 Loop topology Color(green,Pass)?2015-01-08
IG-ST-3 Linear topology Color(green,Pass)?2015-01-08
IG-ST-4 New Site to GPO EGColor(green,Pass)?2015-01-09
IG-ST-5 Site Information Color(green,Pass)?2015-02-04
IG-ST-6 OpenFlow topology Color(green,Pass)?2015-01-26 NAT Problem

Clemson InstaGENI

InstaGENI Site Status: Pass
Stitching Confirmation Tests Logs: here
Stitching Request RSpecs: here

Test AL2S State Date Completed Tickets Notes
IG-ST-1 New Site to GPO IG Color(green,Pass)?2015-03-11
IG-ST-2 Loop topology Color(green,Pass)?2015-03-11
IG-ST-3 Linear topology Color(green,Pass)?2015-03-11
IG-ST-4 New Site to GPO EGColor(green,Pass)?2015-03-12
IG-ST-5 Site Information Color(green,Pass)?2015-03-12
IG-ST-6 OpenFlow topology Color(green,Pass)?2015-03-11

Clemson OpenGENI

OpenGENI Site Status: In Progress
Stitching Confirmation Tests Logs: here
Stitching Request RSpecs: here

Test ION State ION CompletedTickets Notes
OG-ST-1 New Site to GPO IG Color(green,Pass)?2014-09-17
OG-ST-2 Loop topology Color(green,Pass)?2014-09-17
OG-ST-3 Linear topology Color(green,Pass)?2014-09-17
OG-ST-4 New Site to GPO EGColor(green,Pass)?2014-10-27 AMQP misconfiguration bug(EG)!, ExoSM maintanance, ticket 1341
OG-ST-5 Site Information Color(green,Pass)?2014-09-18 Not in list of production stitching sites, provisional
OG-ST-6 OpenFlow topology Color(green,Pass)?2014-09-17 Access to AL2S, but stitching over ION

Florida International University

ExoGENI Site Status: In Progress Stitching Confirmation Tests Logs: here
Stitching Request RSpecs: here

Test State Completed Tickets Notes
EG-ST-1 New Site to GPO IG Color(green,Pass)? 2017-04-03
EG-ST-2 Loop topology Color(orange,Blocked)? EG supports only one GENI Stitched link per site.
EG-ST-3 Linear topology Color(orange,Blocked)? EG supports only one GENI Stitched link per site.
EG-ST-4 New Site to GPO EGColor(green,Pass)?2017-04-26
EG-ST-5 Site Information
EG-ST-6 OpenFlow topology

George Washington University

ExoGENI Site Status: In Progress Stitching Confirmation Tests Logs: here
Stitching Request RSpecs: here

Test State CompletedTickets Notes
EG-ST-1 New Site to GPO IG Color(green,Pass)?2017-04-03
EG-ST-2 Loop topology Color(orange,Blocked)? EG supports only one GENI Stitched link per site.
EG-ST-3 Linear topology Color(orange,Blocked)? EG supports only one GENI Stitched link per site.
EG-ST-4 New Site to GPO EGColor(green,Pass)?2017-04-03
EG-ST-5 Site Information
EG-ST-6 OpenFlow topology

Georgia Tech InstaGENI

InstaGENI Site Status:
Stitching Confirmation Tests Logs: here
Stitching Request RSpecs: here

Test AL2S State Date Completed Tickets Notes
IG-ST-1 New Site to GPO IG Color(green,Pass)?2015-03-16 NO Connectivity
IG-ST-2 Loop topology Color(green,Pass)?2015-03-16
IG-ST-3 Linear topology Color(green,Pass)?2015-03-16
IG-ST-4 New Site to GPO EGColor(green,Pass)?2015-03-16
IG-ST-5 Site Information Color(green,Pass)?2015-03-17
IG-ST-6 OpenFlow topology Color(green,Pass)?2015-03-16

GPO OpenGENI

OpenGENI Site Status: Pass
Stitching Confirmation Tests Logs: here
Stitching Request RSpecs: here

Test ION State ION CompletedTickets Notes
OG-ST-1 New Site to GPO IG Color(green,Pass)? 2014-09-10 No VLAN for co-located GPO IG, used Stanford IG as remote
OG-ST-2 Loop topology Color(green,Pass)? 2014-09-10
OG-ST-3 Linear topology Color(green,Pass)? 2014-09-11
OG-ST-4 New Site to GPO EGN/A No VLAN for co-located GPO EG, No other EG site support stitching
OG-ST-5 Site Information Color(green,Pass)?2014-09-18 Not in list of production stitching sites, provisional
OG-ST-6 OpenFlow topology Color(green,Pass)? 2014-09-16 Over ION

MAX

InstaGENI Site Status: Pass
Stitching Confirmation Tests Logs: here
Stitching Request RSpecs: here

Test ION State ION Completed Tickets Notes
IG-ST-1 New Site to GPO IG Color(green,Pass)?2013-12-03 #1157
IG-ST-2 Loop topology Color(green,Pass)?2013-12-03
IG-ST-3 Linear topology Color(green,Pass)?2013-12-03
IG-ST-4 New Site to GPO EGColor(green,Pass)?2013-12-05
IG-ST-5 Site Information Color(green,Pass)?2013-12-09
IG-ST-6 OpenFlow topology Color(green,Pass)?2013-07-29 over ION

Northwestern University

InstaGENI Site Status: Pass
Stitching Confirmation Tests Logs: here
Stitching Request RSpecs: here

Test State Completed Tickets Notes
IG-ST-1 New Site to GPO IG Color(green,Pass)?2016-09-12
IG-ST-2 Loop topology Color(green,Pass)?2016-09-12
IG-ST-3 Linear topology Color(green,Pass)?2016-09-12
IG-ST-4 New Site to GPO EGColor(green,Pass)?2016-09-13
IG-ST-5 Site Information Color(green,Pass)? 2016-09-13
IG-ST-6 OpenFlow topology Color(green,Pass)? 2016-09-13

NPS

InstaGENI Site Status: Pass
Stitching Confirmation Tests Logs: here
Stitching Request RSpecs: here

Test ION State ION Completed Tickets Notes
IG-ST-1 New Site to GPO IG Color(green,Pass)?2014-10-31
IG-ST-2 Loop topology Color(green,Pass)?2014-10-31
IG-ST-3 Linear topology Color(green,Pass)?2014-10-31
IG-ST-4 New Site to GPO EGColor(green,Pass)?2014-10-31
IG-ST-5 Site Information Color(green,Pass)?2014-10-31
IG-ST-6 OpenFlow topology Color(green,Pass)?2014-10-31 over ION

NYSERNet

InstaGENI Site Status: Pass
Stitching Confirmation Tests Logs: here
Stitching Request RSpecs: here

Test ION State ION Completed Tickets Notes
IG-ST-1 New Site to GPO IG Color(green,Pass)?2013-11-19
IG-ST-2 Loop topology Color(green,Pass)?2013-11-19
IG-ST-3 Linear topology Color(green,Pass)?2013-11-20
IG-ST-4 New Site to GPO EGColor(green,Pass)?2013-11-19
IG-ST-5 Site Information Color(green,Pass)?2013-11-20 #1154
IG-ST-6 OpenFlow topology Color(green,Pass)?2013-07-29 over ION

Pittsburgh Supercomputing Center

ExoGENI Site Status: In Progress Stitching Confirmation Tests Logs: here
Stitching Request RSpecs: here

Test State Completed Tickets Notes
EG-ST-1 New Site to GPO IG Color(green,Pass)?2017-04-03
EG-ST-2 Loop topology Color(orange,Blocked)? EG supports only one GENI Stitched link per site.
EG-ST-3 Linear topology Color(orange,Blocked)? EG supports only one GENI Stitched link per site.
EG-ST-4 New Site to GPO EGColor(green,Pass)?2017-04-03
EG-ST-5 Site Information
EG-ST-6 OpenFlow topology

Rutgers University

InstaGENI Site Status: Pass
Stitching Confirmation Tests Logs: here
Stitching Request RSpecs: here

Test ION State ION Completed AL2S State AL2S CompletedNotes
IG-ST-1 New Site to GPO IG Color(green,Pass)?2014-08-01 Color(green,Pass)?2014-12-05
IG-ST-2 Loop topology Color(green,Pass)?2014-08-01 Color(green,Pass)?2015-01-05 SCS ticket #1357
IG-ST-3 Linear topology Color(green,Pass)?2014-08-04 Color(green,Pass)?2014-12-10
IG-ST-4 New Site to GPO EGColor(green,Pass)?2014-08-04 Color(green,Pass)?2015-01-14
IG-ST-5 Site Information Color(green,Pass)?2014-09-29 Color(green,Pass)?2014-12-03
IG-ST-6 OpenFlow topology Color(green,Pass)?2014-08-05 Color(green,Pass)?2015-01-14

SOX InstaGENI

InstaGENI Site Status: Pass
Stitching Confirmation Tests Logs: here
Stitching Request RSpecs: here

Test AL2S State Date Completed Tickets Notes
IG-ST-1 New Site to GPO IG Color(green,Pass)?2015-03-11
IG-ST-2 Loop topology Color(green,Pass)?2015-03-11
IG-ST-3 Linear topology Color(green,Pass)?2015-03-12
IG-ST-4 New Site to GPO EGColor(green,Pass)?2015-03-12
IG-ST-5 Site Information Color(green,Pass)?2015-03-12
IG-ST-6 OpenFlow topology Color(green,Pass)?2015-03-11

Stanford University

InstaGENI Site Status: Pass
Stitching Confirmation Tests Logs: here
Stitching Request RSpecs: here

Test ION State ION CompletedAL2S StateAL2S Completed Notes
IG-ST-1 New Site to GPO IG Color(green,Pass)?2014-02-06 Color(green,Pass)?2015-01-05
IG-ST-2 Loop topology Color(green,Pass)?2014-02-03 Color(green,Pass)?2015-01-05
IG-ST-3 Linear topology Color(green,Pass)?2014-02-03 Color(green,Pass)?2015-01-20
IG-ST-4 New Site to GPO EGColor(green,Pass)?2014-02-20 Color(orange,Blocked)? EG stitching broken (EG GPO)
IG-ST-5 Site Information Color(green,Pass)?2014-02-20 Color(green,Pass)? 2014-12-03
IG-ST-6 OpenFlow topology Color(green,Pass)?2013-07-29 Color(green,Pass)? 2015-01-09

Texas A & M University

ExoGENI Site Status:
Stitching Confirmation Tests Logs: here
Stitching Request RSpecs: here

Test AL2S State AL2S Completed Tickets Notes
EG-ST-1 New Site to GPO IG Color(green,Pass)?2014-11-10
EG-ST-2 Loop topology Color(orange,Blocked)? exoticket:1156EG supports only one GENI Stitched link per site.
EG-ST-3 Linear topology Color(orange,Blocked)? exoticket:1156EG supports only one GENI Stitched link per site.
EG-ST-4 New Site to GPO EGColor(green,Pass)? 2014-11-11
EG-ST-5 Site Information Color(#63B8FF,In Progress)? Need to add to list of stitching site, when issues are resolved.
EG-ST-6 OpenFlow topology Color(#63B8FF,In Progress)? sent email to Ilya about support and syntax for this test.

University of Alaska

ExoGENI Site Status: In Progress Stitching Confirmation Tests Logs: here
Stitching Request RSpecs: here

Test State Completed Tickets Notes
EG-ST-1 New Site to GPO IG Color(green,Pass)?2017-04-03
EG-ST-2 Loop topology |Color(orange,Blocked)? EG supports only one GENI Stitched link per site.
EG-ST-3 Linear topology Color(orange,Blocked)? EG supports only one GENI Stitched link per site.
EG-ST-4 New Site to GPO EGColor(green,Pass)?2017-04-03
EG-ST-5 Site Information
EG-ST-6 OpenFlow topology

University of California - Davis

Color(orange,Site is decommissioned and is no longer available.)?

ExoGENI Site Status:
Stitching Confirmation Tests Logs: here
Stitching Request RSpecs: here

Test AL2S State AL2S Completed Tickets Notes
EG-ST-1 New Site to GPO IG Color(green,Pass)? 2014-11-11
EG-ST-2 Loop topology Color(orange,Blocked)? exoticket:1156EG supports only one GENI Stitched link per site.
EG-ST-3 Linear topology Color(orange,Blocked)? exoticket:1156EG supports only one GENI Stitched link per site.
EG-ST-4 New Site to GPO EGColor(green,Pass)?2014-11-12
EG-ST-5 Site Information Color(#63B8FF,In Progress)? Need to add to list of stitching site, when issues are resolved.
EG-ST-6 OpenFlow topology Color(#63B8FF,In Progress)? sent email to Ilya about support and syntax for this test.

University of California - Los Angeles

InstaGENI Site Status: Pass
Stitching Confirmation Tests Logs: here
Stitching Request RSpecs: here

Test AL2S State AL2S Completed Tickets Notes
IG-ST-1 New Site to GPO IG Color(green,Pass)?2014-11-18
IG-ST-2 Loop topology Color(green,Pass)?2014-11-18
IG-ST-3 Linear topology Color(green,Pass)?2014-11-19
IG-ST-4 New Site to GPO EGColor(green,Pass)?2014-11-20
IG-ST-5 Site Information Color(green,Pass)?2015-02-04
IG-ST-6 OpenFlow topology Color(green,Pass)?2015-01-26 NAT Problem

University of Chicago

InstaGENI Site Status: Pass
Stitching Confirmation Tests Logs: here
Stitching Request RSpecs: here

Test AL2S State AL2S CompletedTickets Notes
IG-ST-1 New Site to GPO IG Color(green,Pass)?2014-09-29
IG-ST-2 Loop topology Color(green,Pass)?2014-09-29
IG-ST-3 Linear topology Color(green,Pass)?2014-09-30
IG-ST-4 New Site to GPO EGColor(green,Pass)?2014-09-30
IG-ST-5 Site Information Color(green,Pass)?2015-02-04
IG-ST-6 OpenFlow topology Color(green,Pass)?2014-09-29 ticket 140

University of Florida

ExoGENI Site Status: In Progress Stitching Confirmation Tests Logs: here
Stitching Request RSpecs: here

Test State Completed Tickets Notes
EG-ST-1 New Site to GPO IG Color(green,Pass)?2017-04-05
EG-ST-2 Loop topology Color(orange,Blocked)? EG supports only one GENI Stitched link per site.
EG-ST-3 Linear topology Color(orange,Blocked)? EG supports only one GENI Stitched link per site.
EG-ST-4 New Site to GPO EGColor(green,Pass)?2017-04-05
EG-ST-5 Site Information
EG-ST-6 OpenFlow topology

University of Hawaii

InstaGENI Site Status: In Progress
Stitching Confirmation Tests Logs: here
Stitching Request RSpecs: here

Test State Completed Tickets Notes
IG-ST-1 New Site to GPO IG Color(green,Pass)?2017-04-19
IG-ST-2 Loop topology Color(green,Pass)?2017-04-19
IG-ST-3 Linear topology Color(green,Pass)?2017-04-20
IG-ST-4 New Site to GPO EGColor(green,Pass)?2017-04-20
IG-ST-5 Site Information Color(#63B8FF,In Progress)? Wrong URL on VLAN delegation page. To be added to stitching site page
IG-ST-6 OpenFlow topology Color(green,Pass)?2017-04-2

University of Massachusetts

ExoGENI Site Status: In Progress Stitching Confirmation Tests Logs: here
Stitching Request RSpecs: here

Test State Completed Tickets Notes
EG-ST-1 New Site to GPO IG Unable to stitch to GPO
EG-ST-2 Loop topology
EG-ST-3 Linear topology
EG-ST-4 New Site to GPO EG
EG-ST-5 Site Information
EG-ST-6 OpenFlow topology

University of Northern Florida

ExoGENI Site Status: In Progress Stitching Confirmation Tests Logs: here
Stitching Request RSpecs: here

Test AL2S State AL2S Completed Tickets Notes
EG-ST-1 New Site to GPO IG Color(green,Pass)? 2016-08-15
EG-ST-2 Loop topology Color(orange,Blocked)? exoticket:1156EG supports only one GENI Stitched link per site.
EG-ST-3 Linear topology Color(orange,Blocked)? exoticket:1156EG supports only one GENI Stitched link per site.
EG-ST-4 New Site to GPO EGColor(green,Pass)? 2017-04-03
EG-ST-5 Site Information Color(#63B8FF,In Progress)? Need to add to list of stitching site, when issues are resolved.
EG-ST-6 OpenFlow topology Color(#63B8FF,In Progress)? sent email to Ilya about support and syntax for this test.

University of Illinois

InstaGENI Site Status: Pass
Stitching Confirmation Tests Logs: here
Stitching Request RSpecs: here

Test ION State ION CompletedTickets Notes
IG-ST-1 New Site to GPO IG Color(green,Pass)? 2013-12-11
IG-ST-2 Loop topology Color(green,Pass)? 2013-12-11
IG-ST-3 Linear topology Color(green,Pass)? 2013-12-11
IG-ST-4 New Site to GPO EGColor(green,Pass)? 2013-12-11
IG-ST-5 Site Information Color(green,Pass)? 2013-12-11
IG-ST-6 OpenFlow topology Color(green,Pass)? 2013-07-30 over ION

University of Kansas

InstaGENI Site Status: Pass
Stitching Confirmation Tests Logs: here
Stitching Request RSpecs: here

Test AL2S State AL2S Completed Tickets Notes
IG-ST-1 New Site to GPO IG Color(green,Pass)?2014-11-18
IG-ST-2 Loop topology Color(green,Pass)?2014-11-18
IG-ST-3 Linear topology Color(green,Pass)?2014-11-18
IG-ST-4 New Site to GPO EGColor(green,Pass)?2014-11-18
IG-ST-5 Site Information Color(green,Pass)?2015-02-04
IG-ST-6 OpenFlow topology Color(green,Pass)?2014-11-18

University of Kentucky IG

InstaGENI Site Status: Pass
Stitching Confirmation Tests Logs: here
Stitching Request RSpecs: here

Test AL2S State AL2S Completed Tickets Notes
IG-ST-1 New Site to GPO IG Color(green,Pass)? 2015-04-06
IG-ST-2 Loop topology Color(green,Pass)? 2015-04-06
IG-ST-3 Linear topology Color(green,Pass)? 2015-04-06
IG-ST-4 New Site to GPO EG Color(green,Pass)? 2015-04-06
IG-ST-5 Site Information Color(green,Pass)? 2015-04-06
IG-ST-6 OpenFlow topology Color(green,Pass)? 2015-04-06

University of Kentucky MCV

InstaGENI Site Status: Pass
Stitching Confirmation Tests Logs: here
Stitching Request RSpecs: here

Test AL2S State AL2S Completed Tickets Notes
IG-ST-1 New Site to GPO IG Color(green,Pass)? 2016-01-25
IG-ST-2 Loop topology Color(green,Pass)? 2016-01-25
IG-ST-3 Linear topology Color(green,Pass)? 2016-01-25
IG-ST-4 New Site to GPO EGColor(green,Pass)? 2016-01-25
IG-ST-5 Site Information Color(green,Pass)? 2016-02-19 #1497 VLAN Delegation page missing
IG-ST-6 OpenFlow topology Color(green,Pass)? 2016-01-26

University of Kentucky PKS2

InstaGENI Site Status: Pass
Stitching Confirmation Tests Logs: here
Stitching Request RSpecs: here

Test AL2S State ION Completed Tickets Notes
IG-ST-1 New Site to GPO IG Color(green,Pass)? 2014-09-09
IG-ST-2 Loop topology Color(green,Pass)? 2014-09-09
IG-ST-3 Linear topology Color(green,Pass)? 2014-09-09
IG-ST-4 New Site to GPO EGColor(green,Pass)? 2014-09-09
IG-ST-5 Site Information Color(green,Pass)? 2014-09-29
IG-ST-6 OpenFlow topology Color(green,Pass)? 2014-09-29 ticket 140

University of Michigan

InstaGENI Site Status: PASS
Stitching Confirmation Tests Logs: here
Stitching Request RSpecs: here

Test AL2S State AL2S Completed Tickets Notes
IG-ST-1 New Site to GPO IG Color(green,Pass)?2016-04-29 Data loss on all stitching connections
IG-ST-2 Loop topology Color(green,Pass)?2016-04-29 Data loss on all stitching connections
IG-ST-3 Linear topology Color(green,Pass)?2016-04-29 Data loss on all stitching connections
IG-ST-4 New Site to GPO EGColor(green,Pass)?2016-07-13 Data loss on all stitching connections, Waiting for EG update
IG-ST-5 Site Information Color(green,Pass)?2016-07-13
IG-ST-6 OpenFlow topology Color(green,Pass)?2016-06-14

University of Missouri

InstaGENI Site Status: Pass
Stitching Confirmation Tests Logs: here
Stitching Request RSpecs: here

Test ION StateION CompletedAL2S State AL2S Completed Notes
IG-ST-1 New Site to GPO IG Color(green,Pass)? 2013-11-19 Color(green,Pass)? 2014-12-05
IG-ST-2 Loop topology Color(green,Pass)? 2013-11-19 Color(green,Pass)? 2015-01-05 SCS ticket #1357
IG-ST-3 Linear topology Color(green,Pass)? 2013-11-20 Color(orange,Blocked)? ION move for EG GPO
IG-ST-4 New Site to GPO EGColor(green,Pass)? 2013-11-20 Color(green,Pass)? 2014-12-03
IG-ST-5 Site Information Color(green,Pass)? 2013-11-20 Color(green,Pass)? 2015-01-14
IG-ST-6 OpenFlow topology Color(green,Pass)?2013-07-29 Color(green,Pass)? 2015-01-14

University of Missouri Kansas City

InstaGENI Site Status: Pass
Stitching Confirmation Tests Logs: here
Stitching Request RSpecs: here

Test AL2S State AL2S Completed Notes
IG-ST-1 New Site to GPO IG Color(green,Pass)? 2015-04-09
IG-ST-2 Loop topology Color(green,Pass)? 2015-04-09
IG-ST-3 Linear topology Color(green,Pass)? 2015-04-09
IG-ST-4 New Site to GPO EGColor(green,Pass)? 2015-04-09
IG-ST-5 Site Information 2015-04-09
IG-ST-6 OpenFlow topology Color(green,Pass)? 2015-04-09

University of Tennessee Chattanooga

InstaGENI Site Status: Pass
Stitching Confirmation Tests Logs: here
Stitching Request RSpecs: here

Test AL2S State Date Completed Tickets Notes
IG-ST-1 New Site to GPO IG Color(green,Pass)?2015-02-11
IG-ST-2 Loop topology Color(green,Pass)?2015-02-11
IG-ST-3 Linear topology Color(green,Pass)?2015-02-11
IG-ST-4 New Site to GPO EGColor(green,Pass)?2015-02-11
IG-ST-5 Site Information Color(green,Pass)?2015-03-10
IG-ST-6 OpenFlow topology Color(green,Pass)?2015-02-12 Missing NAT

University of Utah CloudLab

CloudLab Site Status: In Progress Stitching Confirmation Tests Logs: here
Stitching Request RSpecs: here

Test AL2S State Date CompletedTicketsNotes
CL-ST-1 New Site to GPO IG Color(green,Pass)? 2015-05-21
CL-ST-2 Loop topology Color(green,Pass)? 2015-05-21
CL-ST-3 Linear topology Color(green,Pass)? 2015-05-21
CL-ST-4 New Site to GPO EGColor(green,Pass)? 2015-05-21
CL-ST-5 Site Information Color(green,Pass)? 2015-05-22 to add to stitching sites
CL-ST-6 OpenFlow topology Color(orange,Blocked)? No OpenFlow over Stitching Support at utah-stitch intermediate hop

A second attempt at running stitching confirmation tests:

Test AL2S State Date CompletedTicketsNotes
CL-ST-1 New Site to GPO IG Color(green,Pass)? 2015-10-01
CL-ST-2 Loop topology
CL-ST-3 Linear topology
CL-ST-4 New Site to GPO EG
CL-ST-5 Site Information
CL-ST-6 OpenFlow topology
CL-ST-7 Multiple CloudLab Sites Topology Color(green,Pass)? 2015-10-01
CL-ST-8 Multiple CloudLab Sites With OF

Utah Stitching Aggregate

* This is a network aggregate used for GENI Network Stitching to connect University of Utah sites compute resources (Utah IG, Utah DDC IG, PG Utah, Utah CloudLab) to the AL2S Network. Confirmation tests are run to verify support for stitching at this network aggregate, by using the Utah sites *

Network Site Status:
Stitching Confirmation Tests Logs: here

Test AL2S StateAl2S CompletedNotes
IG-ST-1 New Site to GPO IG Color(green,Pass)? 2015-06-03
IG-ST-2 Loop topology Color(green,Pass)? 2015-06-03
IG-ST-3 Linear topology Color(green,Pass)? 2015-06-03
IG-ST-4 New Site to GPO EGColor(green,Pass)? 2015-06-03
IG-ST-5 Site Information Color(green,Pass)? 2015-06-03
IG-ST-6 OpenFlow topology Color(orange,Blocked)? Unable to exchange traffic over OF over stitched connction
IG-CT-5 Site Monitoring Color(green,Pass)? 2015-06-03

University of Washington

InstaGENI Site Status: Pass
Stitching Confirmation Tests Logs: here
Stitching Request RSpecs: here

Test AL2S State AL2S CompletedNotes
IG-ST-1 New Site to GPO IG Color(green,Pass)? 2015-02-20 No Stitching Connectivity to Site
IG-ST-2 Loop topology Color(green,Pass)? 2015-02-20
IG-ST-3 Linear topology Color(green,Pass)? 2015-02-20
IG-ST-4 New Site to GPO EGColor(green,Pass)? 2015-02-20
IG-ST-5 Site Information Color(green,Pass)? 2015-03-10
IG-ST-6 OpenFlow topology Color(green,Pass)? 2015-02-25 NAT not configured

University of Wisconsin

InstaGENI Site Status: Pass
Stitching Confirmation Tests Logs: here
Stitching Request RSpecs: here

Test ION State ION CompletedAL2S StateAl2S CompletedNotes
IG-ST-1 New Site to GPO IG Color(green,Pass)?2013-11-21
IG-ST-2 Loop topology Color(green,Pass)?2013-11-22
IG-ST-3 Linear topology Color(green,Pass)?2013-11-22
IG-ST-4 New Site to GPO EGColor(green,Pass)?2013-12-03
IG-ST-5 Site Information Color(green,Pass)?2013-11-23
IG-ST-6 OpenFlow topology Color(green,Pass)?2013-07-29

VirginiaTech

InstaGENI Site Status:
Stitching Confirmation Tests Logs: here
Stitching Request RSpecs: here

Test AL2S StateAl2S CompletedNotes
IG-ST-1 New Site to GPO IG
IG-ST-2 Loop topology
IG-ST-3 Linear topology
IG-ST-4 New Site to GPO EG
IG-ST-5 Site Information
IG-ST-6 OpenFlow topology

Wayne State University

ExoGENI Site Status: In Progress Stitching Confirmation Tests Logs: here
Stitching Request RSpecs: here

Test State Completed Tickets Notes
EG-ST-1 New Site to GPO IG Color(green,Pass)?2017-04-03
EG-ST-2 Loop topology Color(orange,Blocked)? EG supports only one GENI Stitched link per site.
EG-ST-3 Linear topology Color(orange,Blocked)? EG supports only one GENI Stitched link per site.
EG-ST-4 New Site to GPO EGColor(green,Pass)?2017-04-03
EG-ST-5 Site Information
EG-ST-6 OpenFlow topology

Email help@geni.net for GENI support or email me with feedback on this page!