Changes between Version 4 and Version 5 of GeniInstrumentationandMeasurementsArchitecture


Ignore:
Timestamp:
11/17/10 11:22:29 (13 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • GeniInstrumentationandMeasurementsArchitecture

    v4 v5  
    11= GENI Instrumentation and Measurements Architecture, Version 0.1 =
    22
    3 An effort is underway to define and document a first view of the GENI Instrumentation and Measurements Architecture.
    4 
    5 
    6 Purpose:[[BR]]
    7 +  Provide a comprehensive and ordered list of topics that must be addressed for a complete architecture[[BR]]
    8 +  Identify the priority topics that the WG needs to address first[[BR]]
    9 +  Pull together contributions by the WG though Spiral 2[[BR]]
     3An effort is underway to define and document the GENI Instrumentation and Measurements Architecture.
    104
    115
    126Plan:[[BR]]
    13 Now :  v0.1 DRAFT completed, by GPO;  see http://groups.geni.net/geni/wiki/GeniInstrumentationandMeasurementsArchitecture [[BR]]
    14 By GEC8:  v0.5 draft, by GPO, with contributions from WG[[BR]]
    15 By GEC9:  v1.0 draft, reviewed by WG[[BR]]
     7Completed by GEC7:  v0.1 DRAFT, by GPO [[BR]]
     8Completed by GEC8:  v0.5 DRAFT, by GPO, with revised outline and contributions after 2nd workshop[[BR]]
     9In preparation:  v1.0 DRAFT, including contributions from WG[[BR]]
    1610
    1711
    18 A first DRAFT (v0.1) has been completed by the GPO, and is attached below.  [[BR]]
    19 [http://groups.geni.net/geni/attachment/wiki/Gec7InstMeasWGAgenda/031210%20%20IM-ARCH-GEC7Slides.pdf  slides] [[BR]]
    20 [http://groups.geni.net/geni/wiki/GeniInstrumentationandMeasurementsArchitecture  GENI I&M Architecture document] (15min) [[BR]]
     12A first DRAFT (v0.1) was completed by the GPO:  [http://groups.geni.net/geni/wiki/GeniInstrumentationandMeasurementsArchitecture  GENI I&M Architecture document] [[BR]]
    2113 
    22 This v0.1 DRAFT includes proposed I&M services and a proposed configuration [[BR]]
    23 
     14This DRAFT includes proposed I&M services and a proposed configuration [[BR]]
    2415
    2516Document outline:[[BR]]
     
    413216.  Additional GENI I&M use cases[[BR]]
    4233
     34This document was reviewed at the Inst&Meas WG meeting at GEC7:  [http://groups.geni.net/geni/attachment/wiki/Gec7InstMeasWGAgenda/031210%20%20IM-ARCH-GEC7Slides.pdf  slides] [[BR]]
    4335
    4436
    45 The community is invited to review this draft and provide comments, additions or changes to the Inst&Meas WG SE, Harry Mussman, at hmussman@bbn.com
     37A second DRAFT (v0.5) was completed by the GPO, with input from the 2nd I&M Workshop:   [[BR]]
    4638
    47 This document was reviewed at the Inst&Meas WG meeting at GEC7.
     39This DRAFT has a revised outline: [[BR]]
     40
     41Document outline:[[BR]]
     421.  Document Scope[[BR]]
     432.  Introduction[[BR]]
     443.  Instrumentation and Measurement (I&M) Use Cases  [[BR]]
     454.  Configuration of I&M services[[BR]]
     465.  Interfaces to I&M Services [[BR]]
     476.  Measurement Traffic Flows
     487.  Schema and Protocols for Measurement Data (MD) Flows/File Transfers[[BR]]
     498.  Ownership of MD and Privacy of Owners[[BR]]
     509.  APIs and Protocols for Using I&M Services[[BR]]
     5110.  Discovery, Authorization, Assignment and Binding of GENI I&M Services[[BR]]
     5211.  Measurement Orchestration (MO) service[[BR]]
     5312.  Measurement Point (MP)Service[[BR]]
     5413.  Time-stamping MD[[BR]]
     5514.  Measurement Information (MI) Service  [[BR]]
     5615. Measurement Collection (MC) Service[[BR]]
     5716.  Measurement Analysis and Presentation (MAP) Service[[BR]]
     5817.  Measurement Data Archive (MDA) Service[[BR]]
     59
     60A third DRAFT (v1.0) is in preparation, with input from the WG.   [[BR]]
     61
     62The community is invited to help prepare and review this draft, and provide comments, additions or changes to the Inst&Meas WG SE, Harry Mussman, at hmussman@bbn.com