Changes between Version 110 and Version 111 of GeniInstMeas
- Timestamp:
- 03/02/12 09:25:46 (13 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
GeniInstMeas
v110 v111 15 15 == Scope == 16 16 17 **Provide GENI with broad data gathering, analysis and archival capability that is sufficient for scientific mission, operations, and success of the infrastructure. [[BR]]17 * Provide GENI with broad data gathering, analysis and archival capability that is sufficient for scientific mission, operations, and success of the infrastructure. [[BR]] 18 18 19 19 ---- … … 22 22 23 23 24 **Remove the burden on the GENI researcher to become a system and network measurement infrastructure expert so that the researcher can better focus on the science in their experiments [[BR]]24 * Remove the burden on the GENI researcher to become a system and network measurement infrastructure expert so that the researcher can better focus on the science in their experiments [[BR]] 25 25 26 **Follow the defined I&M architecture, to facilitate reuse and thus continued development of instrumentation and measurement tools [[BR]]26 * Follow the defined I&M architecture, to facilitate reuse and thus continued development of instrumentation and measurement tools [[BR]] 27 27 28 28 ---- … … 30 30 == Roadmap == 31 31 32 ** Two large I&M projects (GIMI and GEMINI) were approved in Sol 3 to provide comprehensive I&M tools; these projects include the groups that have provided the OML, INSTOOLS and LAMP/perfSONAR tools [[BR]]32 * Two large I&M projects (GIMI and GEMINI) were approved in Sol 3 to provide comprehensive I&M tools; these projects include the groups that have provided the OML, INSTOOLS and LAMP/perfSONAR tools [[BR]] 33 33 34 **SOWs for the remaining Year 3 of Sol 2 I&M projects have been re-focused on key topics that need to be resolved [[BR]]34 * SOWs for the remaining Year 3 of Sol 2 I&M projects have been re-focused on key topics that need to be resolved [[BR]] 35 35 36 **Several "design topic teams" have been assembled to resolve key issues [[BR]]36 * Several "design topic teams" have been assembled to resolve key issues [[BR]] 37 37 ---- 38 38 … … 71 71 ---- 72 72 73