34 | | Wisconsin (1724) Suman Banerjee: Status [[BR]] |
35 | | |
36 | | Cisco base station up and running. |
37 | | |
38 | | Have the towers up for base station kit, but not on the air; campus getting AT&T cell overhaul has precedence |
39 | | |
40 | | Working on integration with NEC |
41 | | |
42 | | Plan to set up 3 stations to cover whole Madison campus |
43 | | |
44 | | Want vehicle connectivity, including Madison metro transit |
45 | | |
46 | | Also have a deal with regional bus using 3G |
47 | | |
48 | | Working on handoffs between 3G, WiMAX, WiFi |
49 | | |
50 | | See demo tonight |
51 | | |
52 | | Custom-built WiMAX station on busses |
53 | | |
54 | | Using Cisco modems, and external WimAX antenna on the roof |
55 | | |
56 | | Get 1-1.5 mile range |
| 34 | Wisconsin (1724) Suman Banerjee: [[BR]] |
| 35 | Status [[BR]] |
| 36 | Cisco base station up and running.[[BR]] |
| 37 | Have the towers up for base station kit, but not on the air; campus getting AT&T cell overhaul has precedence[[BR]] |
| 38 | Working on integration with NEC base station[[BR]] |
| 39 | Plan to set up 3 stations to cover whole Madison campus[[BR]] |
| 40 | Want vehicle connectivity, including Madison metro transit[[BR]] |
| 41 | Also have a deal with regional bus using 3G[[BR]] |
| 42 | Working on handoffs between 3G, WiMAX, WiFi[[BR]] |
| 43 | See demo tonight[[BR]] |
| 44 | Custom-built WiMAX station on busses[[BR]] |
| 45 | Using Cisco modems, and external WiMAX antenna on the roof[[BR]] |
| 46 | Get 1-1.5 mile range[[BR]] |