Changes between Version 4 and Version 5 of Gec9ClusterEAgenda


Ignore:
Timestamp:
10/27/10 11:55:52 (9 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Gec9ClusterEAgenda

    v4 v5  
    1616=== Spiral 3 Roadmap ===
    1717
    18 Harry Mussman [[BR]]
     18Harry Mussman:  Overview [[BR]]
    1919
    2020
    2121=== WiMAX Base Station Installation, Setup and Initial Operation ===
    2222
    23 Raytheon BBN Technologies   Manu Gosain[[BR]]
     23Raytheon BBN Technologies   Manu Gosain:  Status and Experience  [[BR]]
     24Wisconsin (1724)        Suman Banerjee:  Status [[BR]]
     25UMass Amherst (1731)    Brian Lynn:  Status [[BR]]     
     26Polytechnic Institute of NYU (1751)       Thanasis Korakis:  Status and Experience [[BR]]
     27Colorado: (1768) Dirk Grunwald:  Status [[BR]]
     28Columbia University (1770)      Henning Schulzrinne:  Status [[BR]]
     29UCLA (1797)     Giovanni Pau:  Status [[BR]]
     30 
     31Discussion of WiMAX base station installation, setup and operation issues  [[BR]]
     32
     33
     34=== WiMAX Range and Capacity ===
     35
     36Raytheon BBN Technologies   Tony Michel:  Measurements,  Initial Conclusions,  Potential Site Planning Tools [[BR]]
    2437Wisconsin (1724)        Suman Banerjee [[BR]]
    2538UMass Amherst (1731)    Brian Lynn [[BR]]       
    2639Polytechnic Institute of NYU (1751)       Thanasis Korakis[[BR]]
    27 Colorado: (1768) Dirk Grunwald [[BR]]
     40Colorado: (1768) Dirk Grunwald:  WiMAX Site Survey Process [[BR]]
    2841Columbia University (1770)      Henning Schulzrinne [[BR]]
    29 UCLA (1797)     Giovanni Pau [[BR]]
    30  
     42UCLA (1797)     Giovanni Pau:  Use of WiMAX Range Tools [[BR]]
    3143
    32 === WiMAX Range and Capacity ===
     44Discussion of WiMAX range and capacity issues for Spiral 3  [[BR]]
    3345
    34 at BBN  [[BR]]
    35 Raytheon BBN Technologies   Tony Michel    Measurements,  Initial Conclusions,  Potential Site Planning Tools [[BR]]
    36 Wisconsin (1724)        Suman Banerjee [[BR]]
    37 UMass Amherst (1731)    Brian Lynn [[BR]]       
     46=== WiMAX Mobile Stations (Clients) ===
     47
     48Including:
     49        Windows PC with dongle based on Beceem chips [[BR]]
     50        Linux PC with Intel card [[BR]]
     51        Android HTC EVO handset [[BR]]
     52        Vehicular mobile node [[BR]]
     53       
     54Raytheon BBN Technologies   Manu Gosain:  Linux PC with Intel card, Status and Experinece
     55Raytheon BBN Technologies   Tony Michel:  Android HTC EVO handset, Status and Experience
     56Wisconsin (1724)        Suman Banerjee:  Vehicular mobile node, Plans  [[BR]]
     57UMass Amherst (1731)    Brian Lynn: Vehicular mobile node, Plans [[BR]]
    3858Polytechnic Institute of NYU (1751)       Thanasis Korakis[[BR]]
    3959Colorado: (1768) Dirk Grunwald [[BR]]
    4060Columbia University (1770)      Henning Schulzrinne [[BR]]
    41 UCLA (1797)     Giovanni Pau [[BR]]
    42 === Status and Plans of Campus Deployment Projects ===
    43        
     61UCLA (1797)     Giovanni Pau:  Vehicular mobile node, Plans [[BR]]     
     62
     63Discussion of WiMAX range and capacity issues for Spiral 3  [[BR]]
     64
    4465=== Demo of Base Stations at WINLAB, BBN and NYU Poly ===
    4566
     
    5980
    6081
    61 === Projects and Attendees ===
     82=== Projects and Possible Attendees ===
    6283
    6384Rutgers WINLAB, NICTA and NEC Labs America  (1660, 1657, 1793) PIs:  Ray Raychaudhuri, Marco Gruteser, Ivan Seskar;  Max Ott;  Sampath Rangarajan[[BR]]