Changes between Version 34 and Version 35 of Gec9ClusterDAgenda


Ignore:
Timestamp:
11/02/10 08:32:40 (13 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Gec9ClusterDAgenda

    v34 v35  
    99 System Engineer:  Harry Mussman (GPO, Raytheon BBN Technologies) [[BR]]
    1010
    11 == Spiral 3 Goals (12:00pm, Mussman)  ==
     11== Introductions (12noon)  ==
     12
     13== Spiral 3 Goals (12:05pm, Mussman)  ==
    1214
    1315The following high-level goals have been established by the GPO for Spiral 3:  [[BR]]