[[PageOutline]] = Cluster-D Meetings at GEC8, Agenda and Notes = == Tuesday, July 22, 12noon - 4:30pm == == Introductions (12 noon) == == Review of current status near the end of Spiral 2, and plans for Spiral 3 == === Spiral 2 and Spiral 3 Goals (12:10pm, Mussman) === The following goals have been established by the GPO for Spiral 2. [[BR]] Goal 1: Live experiments, the central goal of Spiral 2. Support significant numbers of research experiments in the end-to-end prototype systems. The GPO expects live experimentation to begin near the end of Spiral 1, which will intensify through Spiral 2 as we begin continuous operation of the prototype systems. This will begin to give us all substantial (early) operational experience, as these experiments will help us all understand the prototypes' strengths and weakness, which will drive our Spiral 3 goals. [[BR]] Goal 2: Identity management [[BR]] Goal 3: Improved integration of data & control planes, within clusters [[BR]] Goal 4: Instrumentation [[BR]] Goal 5: Interoperability, permitting clusters to access the widest number of aggregate [[BR]] For Spiral 3, these goals are reaffirmed, and particularly: [[BR]] Goal 1: Live experiments [[BR]] Goal 2: Identity management [[BR]] Goal 5: Interoperability, permitting clusters to access the widest number of aggregate, including use of GENI AM API [[BR]] === ORCA Software Releases for Spirals 2 and 3 (Baldine, 12:20pm) === ==== Roadmap ==== The ORCA software releases are currently scheduled for every 4 mo. , and include work done by both Solicitation 1 (1582) and Solicitation 2 (1700) ORCA projects. [[BR]] ORCA Rel 1.3 10/1/2009[[BR]] ORCA Rel 2.0 (was 2.1) 2/1/10[[BR]] ORCA Rel 2.1 (was 2.2) 6/1/10[[BR]] ORCA Rel 2.2 (was 2.3) 10/1/10 [[BR]] More in Spiral 3?[[BR]] ==== Status ==== Current progress on each feature, including: [[BR]] Known issues [[BR]] XML-RPC interface [[BR]] Shibboleth interop [[BR]] + XML-RPC Controller[[BR]] - Goal: Provide an XML-RPC interface to ORCA for experiment control tools and external users[[BR]] - Tools/users would use this interface to[[BR]] . discover available resources[[BR]] . instantiate and destroy experiment slivers[[BR]] - Initial version of ProtoGENI-like XML-RPC interface available on an ORCA SM[[BR]] - Generic slice manager acts on behalf of experiment control tools/user[[BR]] - Details of control framework hidden from user[[BR]] - These interfaces provide a minimal set of features[[BR]] . DiscoverResources(), CreateSliver(), DeleteSliver()[[BR]] - Extended set of features (available later) would include[[BR]] . GetTicket(), RedeemTicket(), UpdateTicket(), UpdateSliver()[[BR]] . Support for resource representation using NDL[[BR]] Additional features under consideration for Spiral 3: [[BR]] === Cluster D Operating Capabilities and Clearinghouse (Baldine, 12:40pm) === ==== Roadmap ==== ==== Status ==== === Actor Registry and XML-­RPC Controller === + ORCA Actor Registry[[BR]] - Snapshot of available actors from various ORCA containers[[BR]] — Users can use this for resource discovery and other queries[[BR]] - Users can visit http://geni.renci.org/actors.php to view current set of actors registered with the registry[[BR]] - Users can also programmatically query the registry using an XML-RPC interface[[BR]] === Project Reviews (From 1:00pm through 2:40pm) === Each project should prepare three slides for presentation, and upload to the wiki below: 1) Current status near end of Spiral 2, and plans for Spiral 3 2) Connectivity capabilities 3) Experiment capabilities ==== ORCA/BEN (1:00pm) ==== Ilia Baldine [[BR]] ==== DOME (1:10pm) ==== Brian Lynn [[BR]] ==== ViSE (1:20pm) ==== David Irwin[[BR]] ==== DICloud (1:30pm) ==== Michael Zink [[BR]] ==== KANSEI (1:40pm) ==== Anish Aurora [[BR]] ==== OKGems (1:50pm) ==== Andy Li[[BR]] ==== ERM: Embedded real-time substrate measurements for real-time cross-layer experiments (2:00pm) ==== Keren Bergman, Caroline Lai, Michael Wang [[BR]] ==== LEARN Measurement Handler and Network Integration (2:10pm) ==== Deniz Gurkin[[BR] ==== IMF (2:20pm) ==== Rudra Dutta ==== iGENI (2:30pm) ==== Joe Mambretti, Jim Chen [[BR]] === Break (From 2:40pm through 3:00pm) === == Plan for GEC9 demos/experiments (3:00pm - 3:15pm) == == Discussion of Roadmap for Spiral 3 (3:15pm - 4:00pm) == For Spiral 3, these goals are reaffirmed, and particularly: [[BR]] Goal 1: Live experiments [[BR]] Goal 2: Identity management [[BR]] Goal 5: Interoperability, permitting clusters to access the widest number of aggregate, including use of GENI AM API [[BR]] ORCA features: [[BR]] XML-RPC interface, compatible with GENI AM API Shibboleth interop Cluster D clearinghouse: [[BR]] Operational readiness Connectivity by aggregates Features Cluster D connectivity: [[BR]] Control framework message flows Component programming via SSH VLAN connectivity to aggregates VLAN connectivity between aggregates Experiments: [[BR]] Use by outside researchers Use involving multiple aggregates Use for research experiments == Discussion of Solicitation 3 Possibilities == GENI rack other?