wiki:Gec8ClusterDAgenda

Version 17 (modified by jtaylor@bbn.com, 14 years ago) (diff)

--

Cluster-D Meetings at GEC8, Agenda and Notes

Tuesday, July 22, 12noon - 4:30pm
TENTATIVE

Introductions (12 noon)

Review of current status near the end of Spiral 2, and plans for Spiral 3

Spiral 2 and Spiral 3 Goals (12:10pm, Mussman)

The following goals have been established by the GPO for Spiral 2.

Goal 1: Live experiments, the central goal of Spiral 2. Support significant numbers of research experiments in the end-to-end prototype systems. The GPO expects live experimentation to begin near the end of Spiral 1, which will intensify through Spiral 2 as we begin continuous operation of the prototype systems. This will begin to give us all substantial (early) operational experience, as these experiments will help us all understand the prototypes' strengths and weakness, which will drive our Spiral 3 goals.
Goal 2: Identity management
Goal 3: Improved integration of data & control planes, within clusters
Goal 4: Instrumentation
Goal 5: Interoperability, permitting clusters to access the widest number of aggregate

For Spiral 3, these goals are reaffirmed, and particularly:

Goal 1: Live experiments
Goal 2: Identity management
Goal 5: Interoperability, permitting clusters to access the widest number of aggregate, including use of GENI AM API

ORCA Software Releases for Spirals 2 and 3 (12:20pm, Baldine)

Roadmap

The ORCA software releases are currently scheduled for every 4 mo. , and include work done by both Solicitation 1 (1582) and Solicitation 2 (1700) ORCA projects.

ORCA Rel 1.3 10/1/2009

ORCA Rel 2.0 (was 2.1) 2/1/10
ORCA Rel 2.1 (was 2.2) 6/1/10

ORCA Rel 2.2 (was 2.3) 10/1/10

More in Spiral 3?

Status

Current progress on each feature, including:

Known issues

XML-RPC interface

Shibboleth interop

+ XML-RPC Controller

  • Goal: Provide an XML-RPC interface to ORCA for experiment control tools and external users
  • Tools/users would use this interface to

. discover available resources
. instantiate and destroy experiment slivers

  • Initial version of ProtoGENI-like XML-RPC interface available on an ORCA SM
  • Generic slice manager acts on behalf of experiment control tools/user
  • Details of control framework hidden from user
  • These interfaces provide a minimal set of features

. DiscoverResources(), CreateSliver(), DeleteSliver()

  • Extended set of features (available later) would include

. GetTicket(), RedeemTicket(), UpdateTicket(), UpdateSliver()
. Support for resource representation using NDL

Additional features under consideration for Spiral 3:

Cluster D Operating Capabilities and Clearinghouse (12:40pm, Baldine)

Roadmap

Status

Actor Registry and XML-­RPC Controller

+ ORCA Actor Registry

  • Snapshot of available actors from various ORCA containers

— Users can use this for resource discovery and other queries

  • Users can visit http://geni.renci.org/actors.php to view current set of actors registered with the registry
  • Users can also programmatically query the registry using an XML-RPC interface

Project Reviews (From 1:00pm through 2:40pm)

Each project should prepare NO MORE THAN THREE slides for presentation, and upload to the wiki below:

1) Current status near end of Spiral 2, and plans for Spiral 3:

2) Connectivity capabilities, now near end of Spiral 2, and plans for Spiral 3:

Control framework message flows?
Component programming via SSH?
VLAN connectivity to Internet 2? NLR? How many VLANs? (Goal: By 10/1/09)
Ability to control setup of VLANs as part of experiment? (Goal: By 3/16/10, GEC7)
Ability to control setup of VLANs as part of experiment involving multiple aggregates? (Goal: By 7/20/10, GEC8)

3) Experiment capabilities, now near end of Spiral 2, and plans for Spiral 3:

Ready to use by outside researchers? How is it done? (Goal: By 11/16/09, GEC6)
Use by outside researchers? What has been done?
Use involving multiple aggregates? What has been done? (Goal: By 7/20/10, GEC8)
Use for research experiments? What has been done?

ORCA/BEN (1:00pm)

Ilia Baldine

DOME (1:10pm)

Brian Lynn

ViSE (1:20pm)

David Irwin

DICloud (1:30pm)

Michael Zink

KANSEI (1:40pm)

Anish Aurora

OKGems (1:50pm)

Andy Li

ERM: Embedded real-time substrate measurements for real-time cross-layer experiments (2:00pm)

Keren Bergman, Caroline Lai, Michael Wang

LEARN Measurement Handler and Network Integration (2:10pm)

Deniz Gurkan presentation

IMF (2:20pm)

Rudra Dutta

iGENI (2:30pm)

Joe Mambretti, Jim Chen

Break (From 2:40pm through 3:00pm)

Plan for GEC9 demos/experiments (3:00pm - 3:15pm)

Discussion of Roadmap for Spiral 3 (3:15pm - 4:00pm)

For Spiral 3, these goals are reaffirmed, and particularly:

Goal 1: Live experiments
Goal 2: Identity management
Goal 5: Interoperability, permitting clusters to access the widest number of aggregate, including use of GENI AM API

ORCA features:

XML-RPC interface, compatible with GENI AM API
Shibboleth interop

Cluster D clearinghouse:

Operational readiness
Connectivity by aggregates
Features

Cluster D connectivity:

Control framework message flows
Component programming via SSH
VLAN connectivity to Internet 2 or NLR Many VLANs
Bridge between backbone networks
Ability to control setup of VLANs as part of experiment
Ability to control setup of VLANs as part of experiment involving multiple aggregates

Experiments:

Use by outside researchers
Use involving multiple aggregates
Use for research experiments

Adjourn (4:30pm)

References

DOME slides

DiCloud slides

Attachments (14)