Version 4 (modified by 14 years ago) (diff) | ,
---|
Draft Agenda for OMIS meeting at GEC7
The seventh GENI Engineering Conference, hosted by Duke University and RENCI will take place March 16 – 18, 2010 in Durham, North Carolina. The OMIS WG will meet from 3:30 to 5:30 pm on Wednesday, March 17 (the Instrumentation and Measurement working group meets at the same time).
This draft OMIS agenda includes topics that people have suggested or requested since the last OMIS meeting. There is an OMIS teleconference on 2/4 to discuss agenda topics and ordering. See OMIS archives for more teleconference information.
We want to encourage lots of discussion at OMIS meetings, so even though there will be some prepared presentations, they are meant to get people talking. One of the chairs will "moderate" each topic to make sure we take best advantage of our short meeting time. Please read the documents and look at any presentations attached to this page in advance.
Agenda
- Administrivia - Jim, Ivan, and Ron
- Introductions, agenda bashing and orientation
- Naming this working group - Jim
- The scope of this working group has changed this year, and there have been some mailing list discussions of how to change the name to reflect this
- Items up for working group review (and possibly approval)
- Emergency Stop functions for operations. Read the ES document
- Concepts of Operations Read the ConOps document
- Maintaining an OMIS index to GENI security-releated documents - Adam J. Slagell, NCSA
- TBD in Slagell's talk below
- Meeting campus needs for operations, integration, and security - Ron
- Reports from projects that have new results to discuss since GEC6
- Spiral 2 security plan (Vic Thomas, GPO)
- GENI Comprehensive Security Program (Adam Slagell, NCSA)
- GENI Security Architecture Toolkit (Stephen Schwab, Cobham)
- Layer 2 backbone, regional, and campus activities (Heidi Picher Dempsey, GPO)
- Comments, complaints and suggestions from GENI campuses based on their experiences since GEC6 - open to all
- Reports from projects that have new results to discuss since GEC6
- Lighning Talks (depending on available time. 5 minutes max. Send requests for lightning talks to omis-wg@geni.net
Attachments (6)
-
GEC 7 OMIS-SecurityPlan.pdf (519.4 KB) - added by 14 years ago.
Spiral 2 Security Plan
-
GEC 7 slagell.ppt (827.5 KB) - added by 14 years ago.
Slagell's presentation at GEC 7
-
GEC 7 OMIS-GSAT-Schwab.ppt (409.0 KB) - added by 14 years ago.
Steve Schwab's "What's up next?" security for operations talk
-
GMOC-OMIS-dkim.pdf (2.5 MB) - added by 14 years ago.
International GMOC Collaboration over K-GENI
-
GMOC OMIS update presentation 03|10.pdf (1.8 MB) - added by 14 years ago.
Emergency Stop Presentation
-
concept of operations 03|10.pdf (913.8 KB) - added by 14 years ago.
Concept of Operations Presentation