Version 9 (modified by 15 years ago) (diff) | ,
---|
DRAFT agenda for I&M WG meeting at GEC7 =
Wednesday, March 17, 2010, 3:30pm - 5:30pm
Room: Presidents 2
3:30pm All
Introductions (5min)
3:35pm Paul Barford (University of Wisconsin)
Major WG issues and goals (15min)
Each of the following speakers will be asked to include in their talk a review of how they address the following GENI I&M architecture priority topics:
Common terminology; best granularity of functions
Measurement data schema; common after MPs, before and within MCs, MDAs; what is included in meta-data?
Measurement plane; options; expect nodes with 3 or 2 NICs
3:50pm Jim Griffioen (University of Kentucky)
Instrumentation Tools Project (1642) (15min)
Overview, explanation of demo, review of GENI I&M architecture topics
4:05pm Max Ott (NICTA) (pending)
OMF/OML Project (1660) (15min)
Overview, explanation of demo, review of GENI I&M architecture topics
4:20pm Martin Swany, or delegate (University of Delaware)
perfSONAR (1788)
Overview, explanation of demo, review of GENI I&M architecture topics
4:35pm Brad Huffake (CAIDA, UC San Diego Supercomputing Center)
DatCat Project (15min)
Overview, explanation of services provided and data schema(s), review of GENI I&M architecture topics
4:55pm Harry Mussman (GPO)
GENI I&M Architecture and Use Cases document (15min)
First draft: document outline and configuration drawing
Priority topics:
Common terminology; best granularity of functions
Measurement data schema; common after MPs, before and within MCs, MDAs; what is included in meta-data?
Measurement Plane; options; expect nodes with 3 or 2 NICs
5:10pm Bruce Maggs (Duke University)
Next steps for WG (15min)
5:25pm Harry Mussman (GPO)
Wrap-up, review of action items and issues for planary
5:30pm Adjourn
6:30pm BoF dinner, organized by Harry Mussman, location TBD
Attachments (7)
- 031210 IM-ARCH-GEC7Slides.pdf (825.3 KB) - added by 15 years ago.
- barford gec7_imwg.pdf (32.1 KB) - added by 15 years ago.
- griffioen instools_imwg_gec7.pdf (213.8 KB) - added by 15 years ago.
- huffaker dat cat genie-gec07-201003.pdf (2.1 MB) - added by 15 years ago.
- ott OML - GEC7 - march.pdf (456.9 KB) - added by 15 years ago.
- fernandes swany GEC7-LAMP.ppt (601.0 KB) - added by 15 years ago.
- 031710 WGInstAndMeas_Report.ppt (228.5 KB) - added by 15 years ago.