Changes between Version 51 and Version 52 of Gec7ClusterEAgenda
- Timestamp:
- 03/30/10 16:17:24 (14 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Gec7ClusterEAgenda
v51 v52 59 59 Max on 3/16: Should consider planning tools seen at 3G trade shows, to estimate ranges. [[BR]] 60 60 61 === Status and Plans of All GENI WiMAX Meso-scaleCampus Deployment Projects ===61 === Status and Plans of Campus Deployment Projects === 62 62 63 63 Harry Mussman, and all: [[BR]] … … 70 70 ISSUE: Verify current status with Henning, antenna 360 or 120 degree? [[BR]] 71 71 ISSUE: Harry on 3/30: Concern about Clearwire rollout in NYC; see below. [[BR]] 72 72 NOTE: Stanford agreement with Clearwire to utilize 5MHz of their spectrum for on-campus service. [[BR]] 73 73 74 Polytechnic Institute of NYU (1751) PI: Thanasis Korakis [[BR]] 74 75 Thanasis on 2/8: Starting applciation process. Likely site on EE building. [[BR]] … … 78 79 Antenna 360 degree [[BR]] 79 80 ISSUE: Harry on 3/30: Concern about Clearwire rollout in NYC; see below. [[BR]] 81 NOTE: Stanford agreement with Clearwire to utilize 5MHz of their spectrum for on-campus service. [[BR]] 80 82 81 83 UCLA (1797) PI: Mario Gerla, Giovanni Pau [[BR]] … … 203 205 4) Virtualized WiMAX provides emergency slice; adjust network utilization to assure good QoS for emergency slice; reassign to accomplish dynamic provisioning.[[BR]] 204 206 205 === Clearwire deployments ===207 === Clearwire Deployments === 206 208 207 209 See [http://blog.connectedplanetonline.com/unfiltered/2009/12/01/clearwire-completes-2009-wimax-footprint/ 2009 rollout][[BR]]