Changes between Version 38 and Version 39 of Gec7ClusterEAgenda


Ignore:
Timestamp:
03/30/10 13:13:34 (14 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Gec7ClusterEAgenda

    v38 v39  
    5959 Henning on 2/8:  Starting application process with IT.  Likely site to be on engineering building, near amateur radio station.  [[BR]]
    6060 Ivan on 3/1:  Application completed.  [[BR]]
    61  TASK:  Verify current status with Henning, antenna 360 or 120 degree? [[BR]]
     61 TASK:  Verify current status with Henning.  Concern about Clearwire rollout in NYC in 2010;  any clear spectrum?  Antenna 360 or 120 degree? [[BR]]
    6262               
    6363 Polytechnic Institute of NYU (1751)    PI: Thanasis Korakis [[BR]]
     
    6565 Thanasis on 3/1:  Application completed 2/22, for two sites:  EE and Admin buildings. Equipment expected in EE building. [[BR]]
    6666 Ivan on 3/1:  Cables from roof to equipment room include:  dual fiber;  power;  GPS receiver coax;  within 1" dimaeter.  [[BR]]
    67  Thanasis on 3/16:  Equipment in EE building 100m from antenna, antenna 360 degree [[BR]]
     67 Thanasis on 3/16:  Equipment in EE building 100m from antenna, antenna 360 degree [[BR]]
     68 Harry on 3/30:  Concern about Clearwire rollout in NYC in 2010;  any clear spectrum? 
    6869               
    6970 UCLA (1797)    PI: Mario Gerla, Giovanni Pau [[BR]]