Changes between Version 38 and Version 39 of Gec7ClusterEAgenda
- Timestamp:
- 03/30/10 13:13:34 (14 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Gec7ClusterEAgenda
v38 v39 59 59 Henning on 2/8: Starting application process with IT. Likely site to be on engineering building, near amateur radio station. [[BR]] 60 60 Ivan on 3/1: Application completed. [[BR]] 61 TASK: Verify current status with Henning , antenna 360 or 120 degree? [[BR]]61 TASK: Verify current status with Henning. Concern about Clearwire rollout in NYC in 2010; any clear spectrum? Antenna 360 or 120 degree? [[BR]] 62 62 63 63 Polytechnic Institute of NYU (1751) PI: Thanasis Korakis [[BR]] … … 65 65 Thanasis on 3/1: Application completed 2/22, for two sites: EE and Admin buildings. Equipment expected in EE building. [[BR]] 66 66 Ivan on 3/1: Cables from roof to equipment room include: dual fiber; power; GPS receiver coax; within 1" dimaeter. [[BR]] 67 Thanasis on 3/16: Equipment in EE building 100m from antenna, antenna 360 degree [[BR]] 67 Thanasis on 3/16: Equipment in EE building 100m from antenna, antenna 360 degree [[BR]] 68 Harry on 3/30: Concern about Clearwire rollout in NYC in 2010; any clear spectrum? 68 69 69 70 UCLA (1797) PI: Mario Gerla, Giovanni Pau [[BR]]