Changes between Version 35 and Version 36 of Gec7ClusterEAgenda


Ignore:
Timestamp:
03/30/10 12:24:15 (14 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Gec7ClusterEAgenda

    v35 v36  
    25251:05pm, Ivan Seskar:  [[BR]]
    2626 [http://groups.geni.net/geni/attachment/wiki/Gec7ClusterEAgenda/2010-03-16%20GEC7%20WiMAX.ppt  Update on WiMAX Base Station and WiMAX Client Platform Kits] [[BR]]
    27 
    28   Ivan on 3/1:  Cables from roof to equipment room include:  dual fiber;  power;  GPS receiver coax;  within 1" dimaeter.  [[BR]]
     27 
     28 Ivan on 3/1:  Cables from roof to equipment room include:  dual fiber;  power;  GPS receiver coax;  within 1" dimaeter.  [[BR]]
    2929 
    3030 Ivan:  Inclusion and choice of GPS antenna, for timing to base station  [[BR]]