Changes between Version 8 and Version 9 of Gec6ClusterDAgenda


Ignore:
Timestamp:
11/23/09 15:18:24 (14 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Gec6ClusterDAgenda

    v8 v9  
    66== Nov. 16, 1pm - 5pm ==
    77
    8 ==  1.  Project Introductions (please concentrate on vision and Spiral 2 critical milestones) ==
     8==  1.  Project Introductions  ==
     9(please concentrate on vision and Spiral 2 critical milestones)
    910
    1011=== 1.1 DOME  ===
     
    9293Deniz  Gurkin and Paul ?  slides
    9394
    94 VLAN ID ranges
    95 LEARN 3200 - 4000
     95VLAN ID ranges:  [[BR]]
     96LEARN 3200 - 4000[[BR]]
     97NLR-LEARN-BEN  2500 - 2042[[BR]]
    9698
    97 NLR-LEARN-BEN  2500 - 2042
     99What experiments? [[BR]]
     100Need good set of experimentw to attrach interest at campuses who would connect to LEARN  [[BR]]
     101Need beacon to advertise resources[[BR]]
     102Soon:  actor registry;  and what is delegated to brokers 
    98103 
    99  
    100  what experiments?
    101  
    102  beacon to advertise resources
    103  
    104  soon:  actor registry;  and what is delegated to brokers 
    105  
    106 Harry
    107 drawing again
     104=== 3.4  Summary of Cluster D VLAN connectivity ===
    108105
     106Harry Mussman   drawing
    109107
    110 Ilia, Joe, Deniz to plan VLAN mappings
     108Expected Step 1:  [[BR]]
     109BEN, UMass Amherst, BBN, Ohio State and LEARN-connected aggregates are interconnected through NLR [[BR]]
     110NLR Framenet, LEARN and regionals provide VLAN connections that join aggregates, that can be reserved,or possibly setup on demand. [[BR]]
     111Each aggregate connects its resource to the VLAN connection endpoint  [[BR]]
    111112
    112 Ongoing:
     113Next: Ilia, Joe, Deniz to plan VLAN mappings by NLR Framenet, LEARN and regionals that join aggregates. [[BR]]
    113114
    114 monthly PI calls
     115Expected Step 2: [[BR]]
     116iGENI is used to extend connectivity beyond Step 1 [[BR]]
    115117
    116 calls on specific topics
     118== 4.  Ongoing Cluster D Interactions ==
    117119
    118 resource description
     120Monthly PI calls
     121Calls on specific topics
     122Resource description
     123Plan for GEC7 demos
    119124
    120 GEC7 demos
     125Topic: accessing substrate not directly connected to public internet (i.e. NAT/firewall traversal)
    121126
     127Topic:  Resource representation
     128ORCA plans to embed declarative resource specifications using NDL (visit similar discussion at the CF WG as well)
     129Co-existence of alternative resource representations in a single framework
     130Planning workshop on NDL
    122131
    123  
    124 ?Accessing substrate not directly connected to public internet (i.e. NAT/firewall traversal)
    125 
    126 
    127 
    128 
    129 •Resource representation
    130 ?ORCA plans to embed declarative resource specifications using NDL (visit similar discussion at the CF WG as well)
    131 ?Co-existence of alternative resource representations in a single framework
    132 
    133 
    134 •GEC7 demo planning
    135 
    136 
    137 
    138  * Cluster-D connectivity
    139   *  Existing connectivity to Internet2, NLR and other fabrics
    140   * Dataplane stitiching discussion (includes presentation from iGENI)
    141   * Accessing substrate not directly connected to public internet (i.e. NAT/firewall traversal)
    142  * Resource representation
    143   * ORCA plans to embed declarative resource specifications using NDL (visit similar discussion at the CF WG as well)
    144   * Co-existence of alternative resource representations in a single framework
    145  * GEC7 demo planning