Version 11 (modified by 15 years ago) (diff) | ,
---|
Experimenter Tools and Services WG Meeting at GEC5
Tuesday 21 July 2009 from 3.30pm to 5.30pm
Topics to be Addressed
- How are experiments specified in each of the Spiral 1 clusters? What are the declarative and procedural aspects of this specification?
- How is this specification used by the tool chain available to experimenters?
- What are the experimenter tools in a cluster that might be ported to other control frameworks?
- What assumptions do tools make about the control framework? What assumptions might be specific to their control framework?
Agenda and Presentations
3.30pm - 3.40pm | Goals and deliverables of the WG; Documents status | Vic Thomas |
3.40pm - 3.45pm | Report on the GENI Measurement Workshop | Joel Sommers |
3.45pm - 4.05pm | ORBIT experimenter tools | Max Ott |
4.05pm - 4.25pm | ORCA experimenter tools | David Irwin and Yufeng Xin |
4.25pm - 4.45pm | ProtoGENI experimenter tools | Rob Ricci |
4.45pm - 5.05pm | PlanetLab experimenter tools | Jeannie Albrecht |
5.05pm - 5.25pm | TIED experimenter tools | Ted Faber |
5.25pm - 5.30pm | Cross-cutting issues across WGs |
Attachments (8)
- gmw-report.pdf (158.7 KB) - added by 15 years ago.
-
GEC 5 Day 2 - WG - Services.pdf (521.0 KB) - added by 15 years ago.
Intro to WG Meeting
-
Describing Experiment in Orbit.pdf (677.5 KB) - added by 15 years ago.
Experiment Specification in ORBIT
-
orca-geni-tools&NDL.pdf (4.8 MB) - added by 15 years ago.
ORCA Tools and Network Description Language
-
PlanetLab-Expt-Tools.pdf (2.3 MB) - added by 15 years ago.
PlanetLab experimenter tools
-
ExptSupport-TIED.pdf (461.1 KB) - added by 15 years ago.
Experimenter support in TIED
-
GEC 5 Day 3 - CrossCutting - Services.pdf (114.2 KB) - added by 15 years ago.
Cross-cutting issues (across working groups)
-
ProtoGENI-Exptools.pdf (844.3 KB) - added by 15 years ago.
ProtoGENI Experimenter Tools