Version 17 (modified by 15 years ago) (diff) | ,
---|
Because both Ilia and Jeff were unable to attend GEC5, Harry assisted Yufeng in organizing and chairing this meeting.
Cluster D Meeting Monday, July 20, 1:00 - 5:00pm
Introduction and agenda review.
How to encourage experiments?
GPO work with NSF. Organize regional workshops. Do press releases. Issue best paper award from GENI experiment.
Focus on status of each project, comparing it to spiral 1 plan document and slides , and on demos to be presented in the evening.
1) ORCA/BEN project
Yufeng summarizes recent work leading to demo of VLAN connections stitched across both NLR and BEN.
See RENCI wiki
See summary document
See slides
Site Authority does cross layer stitching in BEN.
Slice Controller does stitching between BEN and NLR, etc.
2) DOME
Brian summarizes status of DOME project.
See slides
3) ViSE
David summarizes status of ViSE project.
See slides
Custom web portal interfaced with programatic (Java) Slice Controller.
Table-driven policy for Broker.
Now: Sensor (radar) has local storage. But, much data; Need to move to long-term storage, and provide processing.
In favor of NDL. Agree: use NDL for all projects in Spiral 2.
4) Kansei
Mukundan summarizes status of Kansei project.
See slides
Today: One unit equals entire array. Then, which nodes are attached as a property on the ticket.
Next: Multiple slices, each with a selected array and a defined set of nodes.
Today: Three actors arfe in separate servers, Broker at Wayne State and SC and SA at Ohio State.
5) Embedded Real Time Measurements
Karen explained that will integrate with BEN in Spiral 2.
Tuesday, July 21, 1:00 – 3:00pm
Focus on priorities for Spiral 2, particularly first steps in Spiral 2.
See Ilia’s email,
As part of Cluster-D Spiral 2 discussions, we would like to get your feedback on the feature roadmap we presented in the past. The attached document contains the table describing the features (as presented earlier). I would like to get your opinions on which of these are 'critical', 'important' and 'not important' from the perspective of your project. Also, this is your opportunity to 'write in' your desirable ORCA features for consideration in Spiral 2. I would hope to see this list with your proposed ratings and changes as one deliverable of Cluster D discussions at GEC5.
See also document on Spiral 2 goals
Discussion produced list of Spiral 2 items and ratings; see slides
Best wishes,
Harry
Harry E. Mussman Sr. Systems Engineer - GENI Project Office BBN Technologies 10 Moulton Street Cambridge, MA 02138 (617) 873-4282 - Office (781) 266-8479 - Mobile (617) 873-4888 - Fax hmussman@bbn.com www.geni.net
Attachments (12)
- 070209 ClusterD_Spiral1_Plan.doc (91.5 KB) - added by 15 years ago.
- 070209 ClusterD_Spiral1_Plan.ppt (306.5 KB) - added by 15 years ago.
- Orca Feature Roadmap.pdf (39.1 KB) - added by 15 years ago.
- 070209c ClusterD_Spiral2_Goals_Roadmap.doc (153.5 KB) - added by 15 years ago.
- 071509 ORCA_BEN demo.pdf (3.1 MB) - added by 15 years ago.
- GEC5-xin-cluster-d-Spiral-1.pptx (2.3 MB) - added by 15 years ago.
- dome-spiral1.pptx (466.4 KB) - added by 15 years ago.
- vise.pptx (483.3 KB) - added by 15 years ago.
- KanseiPEDemo.pptx (742.5 KB) - added by 15 years ago.
- 072109b ClusterD_Meeting_GEC5.ppt (311.5 KB) - added by 15 years ago.
- 072209b ClusterD_Outbrief_GEC5.ppt (292.0 KB) - added by 15 years ago.
- 070209b ClusterD_Spiral1_Plan.doc (90.0 KB) - added by 15 years ago.