Changes between Version 77 and Version 78 of GRW/GRW-Checklist


Ignore:
Timestamp:
09/19/16 14:02:00 (8 years ago)
Author:
mramamoo@asu.edu
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • GRW/GRW-Checklist

    v77 v78  
    5959=== Four weeks before event ===
    6060 1. Finalize agenda
    61  1. Inform instructors so they can make travel arrangements   '''__[[Color(lightblue, red, Draft mail?)]]__'''
     61 1. Inform instructors so they can make travel arrangements   '''__[[Color(lightblue, green, Draft mail?)]]__''' [https://docs.google.com/document/d/1jhWZT1uwqvImWMLicTDb7cQzGRHyzKURfmlWONXaCMU/ here]
    6262 1. Gather tutorial requirements from instructors  '''__[[Color(lightblue, green , Draft e-mail)]]__'''   [https://docs.google.com/document/d/1wFy7APaHeVSoLEMeXJx0z1mT64uCqtTDnPQeycHG1QI/edit here]
    6363     * Advance work needed by attendees (e.g. tool installation)