Changes between Version 28 and Version 29 of GRW/GRW-Checklist
- Timestamp:
- 09/02/16 09:16:08 (8 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
GRW/GRW-Checklist
v28 v29 60 60 1. Finalize agenda 61 61 1. Inform instructors so they can make travel arrangements '''__[[Color(lightblue, red, ->Draft e-mail here <-)]]__''' 62 1. Gather tutorial requirements from instructors 62 1. Gather tutorial requirements from instructors '''__[[Color(lightblue, red, ->Draft e-mail <-)]]__''' https://docs.google.com/document/d/1wFy7APaHeVSoLEMeXJx0z1mT64uCqtTDnPQeycHG1QI/edit 63 63 * Advance work needed by attendees (e.g. tool installation) 64 64 * Resources required (# of VMs per attendee, etc)