wiki:GIR4_1

Version 1 (modified by lnevers@bbn.com, 12 years ago) (diff)

--

Spiral 4 GENI Integration Release 1

Spiral 4 software milestone deliverables that are available by ?? 2012 will be evaluated as part of the GENI Integration Release (GIR) 4.1. The following page provides a full list of GIR 4.1 software milestones that are GIR4.1 candidates. The evaluation candidates are comprised of software, demonstrations, and resources milestones that are captures by priority within each Network Cluster and that have a software component available to GENI users. This page will capture the state of GIR 4.1 evaluation for each of the selected candidates by priority and on a first-come first-serve basis.

ProjectStatusEvaluation DetailsGIR
OnTime MeasuramentColor(#ffffff , #2E8B57, In Progress)?GIR4.1_OnTimeMeasuraments Yes


For details about the evaluation guidelines used in the GIR 4.1 effort, please refer to the GENI Spiral 4 Integration Release Guidelines document.


Email us with any questions and feedback on this page!

Attachments (1)

Download all attachments as: .zip