Changes between Version 14 and Version 15 of GIR4.1_OnTimeMeasuraments


Ignore:
Timestamp:
02/29/12 15:00:06 (12 years ago)
Author:
lnevers@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • GIR4.1_OnTimeMeasuraments

    v14 v15  
    4141''' Third Try:'''  Re-executed the Flack Client path.
    4242
    43 1. Created a slice named LN4OTM as defined in tutorial's ''Create Slice using Flack'' section instructions:
     431. Created a slice named LN4OTM and defined compute resources as defined in tutorial's ''Create Slice using Flack'' section instructions:
    4444[[Image(otm-flack-1.jpg)]]
     45
     462. Once sliver creation was completed and waiting 5 minutes as instructed, confirmed the installation of Root Beacon by connecting to the  (NOTE: use the URL, i.e., http://pc355.emulab.net:17291):
     47[[Image(otm-root-2.jpg)]