= GIR 3.2 Candidates = This is the full list of Spiral 3 milestones that are due by September 30, 2011 and are potentially to be evaluated for GIR3.2: {{{ #!html
Project |
Milestone |
Milestone Title |
Due Date |
Description |
ABAC |
S3.e |
Software and documentation release. |
09/15/11 |
-Deliver working ABAC software and documentation. ABAC fully integrated with control framework software and is part of the control framework’s default distribution. |
CMU Lab |
S3.f |
Deliver software and documentation. |
09/16/11 |
-Deliver
software and documentation |
COGRADIO |
S3.d |
Documentation and Code Release. |
09/30/11 |
-Release
a full set of design information for stand-alone cognitive radio system
“kit”, including hardware, v1.0 software and reference software
implementations. |
CRON |
S3.g |
Deliver
software, documentation, |
08/19/11 |
-Deliver
stable version software with documentation |
DICLOUD |
S3.e |
Documentation and Code Release. |
04/05/11 |
-Amazon
Images with builds of Orca for the community and operational virtual machines
with OpenVPN support for researchers. Documentation on how to use these AMIs
will be provided. |
DICLOUD |
S3.h |
Documentation and Code Release. |
08/15/11 |
-Release of Gush changes for Orca integration and related documentation. |
DIGOBREG |
S3.d |
Documentation and Code Release. |
04/05/11 |
-Document
the workings and relevant APIs related to MDA prototype. |
DIGOBREG |
S3.f |
Final report and code release. |
08/15/11 |
-Document
MDA API and related functions. |
DOME |
S3.d |
Documentation and Code Release. |
04/05/11 |
-Document prototype of brick supporting a WiMAX client (not deployed on buses). (milestone shared with WiMAX project 1731) |
DOME |
S3.f |
Final report and code release. |
08/15/11 |
-DOME
updated to allocation of WiMAX on buses, scheduling and execution of
experiments that access the WiMAX link. (milestone shared with WiMAX project
1731). |
DSL |
S3.d |
Software and documentation release. |
09/15/11 |
-Deliver working software and documentation of DSL FAITH over GENI so that other researchers can develop similar experiments. |
ENTGENI |
S3.f |
Implement, test, and release a second major release of software |
08/31/11 |
-To address additional Spiral 3 known bugs and requested features for Stanford-supported software in GENI campus deployments. This includes software provided by Stanford and by Stanford’s GENI subcontractors. Currently this list includes FlowVisor, NOX and any other Stanford-recommended controllers, Indigo, SNAC, Expedient and Opt-In Manager |
ERM |
S3.d |
Documentation and Code Release. |
04/05/11 |
-Submit
the architectural design, including PCB layouts, hardware source codes, and
software releases related to the ERM Box. |
ERM |
S3.f |
Final report and code release. |
08/15/11 |
-Describe
the infrastructures in which the ERM boxes were deployed, and what special
requirements these infrastructures required. |
GpENI |
S3.g |
KSU CoreDirector. |
07/31/11 |
-Obtain and install KSU CoreDirector, subject to availability and based on Ciena commitment to obtain CoreDirector from I2. |
GUSH |
S3.d |
Enhanced usability through Gush GUI. |
06/15/11 |
-Provide enhanced usability through Gush GUI. (This will involve another major Nebula release and additional Nebula documentation.) |
GUSH |
S3.f |
Deliver software and documentation. |
08/26/11 |
-Deliver
Gush/Nebula software and documentation to GPO. |
Hive |
S3.f |
Deliver software and documentation. |
09/09/11 |
-Hive
Mind source code and documentation. |
iGENI |
S3.f |
Documentation and Code Release. |
08/15/11 |
- Implement the GENI AM API on ORCA aggregate, when these capabilities are provided by enhanced ORCA code |
IMF |
S3.d |
Documentation and Code Release. |
04/05/11 |
-Code snapshot from IMF version control repository used in the above demonstration will be released, and will include, in separate overview documents as well as detailed in-code comments, enough documentation to allow other researchers who desire to re-use the in-stack measurement consumption functionality of IMF to get started. Pointers to snapshot will be released on the GENI wiki and the IMF project wiki. |
IMF |
S3.f |
Documentation and Code Release. |
08/15/11 |
-Code snapshot of IMF, with documentation, used in above demonstration, as above. |
INSTOOLS |
S3.f |
Documentation and Code Release. |
08/15/11 |
-Deliver latest stable version of this project’s software, documentation and tutorial exercises including software demonstrated at GEC11. |
Kansei |
S3.f |
Final report and code release. |
08/15/11 |
-Includes:
|
LAMP |
S3.h |
Deliver software, documentation, user guides. |
08/26/11 |
-Deliver
software with documentation |
LEARN |
S3.e |
Documentation and Code Release. |
04/05/11 |
-Participate in developing a plan for monitoring and troubleshooting the L2 connectivity from NLR, through LEARN, and to each campus, utilizing the evolving commercial protocols and capabilities. |
LEARN |
S3.g |
Documentation and Code Release. |
08/15/11 |
-Includes applicable handlers, ORCA task/resource assignment code, and guidelines for the GENI community towards creating a similar infrastructure integration using Cisco 3400s. |
MeasurementSys |
S3.f |
Deliver software and documentation. |
08/09/11 |
-Software
with documentation |
MILNGENI |
S3.e |
Documentation and Code Release. |
08/15/11 |
-Latest stable version of MNG software and tutorial exercises including software demonstrated at GEC11. |
NETKARMA |
S3.f |
Deliver software and documentation. |
08/26/11 |
-Documentation
for experimenters on how to collect and use provenance information. |
OFSTAN |
S3.f |
Implement, test, and release a second major release of software |
08/31/11 |
-Implement, test, and release a second major release of software to address additional Spiral 3 known bugs and requested features for Stanford-supported software in GENI campus deployments. This includes software provided by Stanford and by Stanford’s GENI subcontractors. Currently this list includes FlowVisor, NOX and any other Stanford-recommended controllers, Indigo, SNAC, Expedient and Opt-In Manager. |
OKGEMS |
S3.d |
Documentation and Code Release. |
04/05/11 |
-Update testbed documents and sample experiments |
OKGEMS |
S3.f |
Documentation and Code Release. |
08/15/11 |
- Finish documentation and tutorial. Publish some preliminary results. |
OnTime |
S3.f |
Release a software version of OnTimeMeasure that is integrated with other GENI software tools/services |
09/30/11 |
-Software package with detailed documentation for setup and operation with other mature sets of GENI software tools/services pertaining to Experiment Workflow, Security, Measurement, and Operations. |
ORBIT |
S3.d |
Documentation and Code Release. |
04/05/11 |
-Updated OMF/OML code release and documentation through mytestbed.net |
ORBIT |
S3.f |
Final report and code release. |
08/15/11 |
-Updated OMF/OML code release and documentation through mytestbed.net |
ORCAAUG |
S3.f.4 |
ORCA Camano
3.1 code release and |
08/15/11 |
|
ORCABEN |
S3.f.1 |
GUSH integration (w/ GUSH team) |
07/31/11 |
|
ORCABEN |
S3.f.2 |
ORCA Camano 3.1 code release, documentation and final report |
08/15/11 |
|
PGTools |
S3.d |
V2.0 of experimenter tools |
04/15/11 |
|
PGTools |
S3.g |
V2.0 of map interface released. |
08/31/11 |
|
PrimoGENI |
S3.f |
Deliver
software, documentation, |
08/19/11 |
-Deliver
software with documentation |
ProtoGENI |
S3.e |
Software and documentation release. |
08/30/11 |
-Deliver
latest stable version of Emulab software and documentation, containing all
ProtoGENI software developed under this contract. |
RAVEN |
S3.c |
Raven Release. |
05/13/11 |
-Online
documentation/tutorials/examples |
RAVEN |
S3.e |
Raven Release. |
08/15/11 |
-Updated
online documentation/tutorials/examples |
S3MONITOR |
S3.f |
Software and documentation release. |
08/26/11 |
-Software
with documentation including instructions for installation and use. Lead: HP
Labs |
SCAFFOLD |
S3.f |
Deliver software and documentation. |
09/09/11 |
-SCAFFOLD
source code and documentation |
SECUREUPDATES |
S3.e |
Deliver software and documentation. |
08/19/11 |
-Deliver
software with documentation |
SHADOW |
S3.c |
Develop instrumentation tools to make Juniper router info available to ProtoGENI users |
05/31/11 |
-Develop instrumentation tools to make the collected information from the Juniper routers available to ProtoGENI users so they can observe the virtualized router behavior of their experiments.(Kentucky) |
SPP |
S3.d |
NPE Software Revision |
07/30/11 |
-We expect to complete and deploy a new version of the software for the SPP’s Network Processing Engine. This will more than double the computational resources available for application-specific packet processing, significantly increasing system throughput, and will provide substrate support for multicast. |
UMLPEN |
S3.d |
UMLPEN is an operational aggregate. |
05/01/11 |
-Continuously
available |
ViSE |
S3.d |
Documentation and Code Release. |
04/05/11 |
-Documentation for running the enhanced alpha demonstration. Amazon images with builds of Orca for the community and operational virtual machines with OpenVPN support for researchers. Documentation on how to use these AMIs will be provided. |
ViSE |
S3.f |
Final report and code release. |
08/15/11 |
-Release demonstration code to community. |
VMI-FED |
S3.g |
VMI Software and documentation. |
09/09/11 |
- Deliver VMI software and documentation for GENI experimenters. |
WiMAX |
S3.d |
Documentation and Code Release. |
04/05/11 |
-Release of GBSN controller software including RF AggrMgr, ASN Gateway, ASNGW AggrMgr, virtual Base Station (vBS), vBS AggMgr, Switch AggMgr, and operations/management modules. Documentation to be updated and posted on GENI site. |
WiMAX |
S3.f |
Final report and code release. |
08/15/11 |
-Final report on GENI WiMAX base station including architecture, design details and performance validation results. Full code release and documentation with all major software features demonstrated at GEC11. |
WIMXCOLUM |
S3.d |
Documentation and Code Release. |
04/05/11 |
-Update
documentation of your WiMAX base station site |
WIMXCOLUM |
S3.f |
Documentation and Code Release. |
08/15/11 |
-Update
documentation of your WiMAX base station site |
WIMXNYUPT |
S3.d |
Documentation and Code Release. |
04/05/11 |
-Update
documentation of your WiMAX base station site |
WIMXNYUPT |
S3.f |
Documentation and Code Release. |
08/15/11 |
-Update
documentation of your WiMAX base station site |
WIMXRG |
S3.f |
Documentation and Code Release. |
08/15/11 |
-Final report including technical details of WiMAX base station kit and related software features. Updated code release corresponding to capabilities demonstrated at GEC11. |
WIMXUCLA |
S3.d |
Documentation and Code Release. |
04/05/11 |
-Update
documentation of your WiMAX base station site |
WIMXUCLA |
S3.f |
Documentation and Code Release. |
08/15/11 |
-
Update documentation of your WiMAX base station site |
WIMXUCO |
S3.d |
Documentation and Code Release. |
04/05/11 |
-Update
documentation of your WiMAX base station site |
WIMXUCO |
S3.f |
Documentation and Code Release. |
08/15/11 |
-Update
documentation of your WiMAX base station site |
WIMXUMASS |
S3.d |
Documentation and Code Release. |
04/05/11 |
-Update
documentation of your WiMAX base station site |
WIMXUMASS |
S3.f |
Documentation and Code Release. |
08/15/11 |
-WiMAX
deployed on up to 4 buses |
WIMXUWI |
S3.d |
Documentation and Code Release. |
04/05/11 |
-Update
documentation of your WiMAX base station site |
WIMXUWI |
S3.f |
Documentation and Code Release. |
08/15/11 |
-
Acquire and deploy the Wisconsin Mobility Services Engine into MadBed
testbed, and document exposed API. |