wiki:GIR3_2_candidates

Version 1 (modified by lnevers@bbn.com, 13 years ago) (diff)

--

GIR 3.2 Candidates

This is the full list of Spiral 3 milestones that are due by September 30, 2011 and are potentially to be evaluated for GIR3.2:

Project
Acronym

Milestone
number

Milestone Title

Due Date
(MM/DD/YY)

Description

ABAC

S3.e

Software and documentation release.

09/15/11

-Deliver working ABAC software and documentation. ABAC fully integrated with control framework software and is part of the control framework’s default distribution.

CMU Lab

S3.f

Deliver software and documentation.

09/16/11

-Deliver software and documentation
- Deliver documents/web pages tutorials/help pages and examples (updated since Milestone d if necessary) for
GENI experimenters wishing to include CMU Lab resources in their experiments.

COGRADIO

S3.d

Documentation and Code Release.

09/30/11

-Release a full set of design information for stand-alone cognitive radio system “kit”, including hardware, v1.0 software and reference software implementations.
- Release a full set of design information for multi-FPGA infrastructure-class cognitive radio platform “kit” hardware, and Phase II radio card hardware.

CRON

S3.g

Deliver software, documentation,
user guides.

08/19/11

-Deliver stable version software with documentation
- Deliver user guides, tutorials, sample experiments

DICLOUD

S3.e

Documentation and Code Release.

04/05/11

-Amazon Images with builds of Orca for the community and operational virtual machines with OpenVPN support for researchers. Documentation on how to use these AMIs will be provided.
- Add support for user-level quotas and accounting for EC2, S3 and EBS.

DICLOUD

S3.h

Documentation and Code Release.

08/15/11

-Release of Gush changes for Orca integration and related documentation.

DIGOBREG

S3.d

Documentation and Code Release.

04/05/11

-Document the workings and relevant APIs related to MDA prototype.
- Deploy and make available the
MDA prototype instance for use by experimenters and early adopters.

DIGOBREG

S3.f

Final report and code release.

08/15/11

-Document MDA API and related functions.
- Time permitting, document ORCA Registry functional requirements.

DOME

S3.d

Documentation and Code Release.

04/05/11

-Document prototype of brick supporting a WiMAX client (not deployed on buses). (milestone shared with WiMAX project 1731)

DOME

S3.f

Final report and code release.

08/15/11

-DOME updated to allocation of WiMAX on buses, scheduling and execution of experiments that access the WiMAX link. (milestone shared with WiMAX project 1731).
- Documentation for DOME updated.

DSL

S3.d

Software and documentation release.

09/15/11

-Deliver working software and documentation of DSL FAITH over GENI so that other researchers can develop similar experiments.

ENTGENI

S3.f

Implement, test, and release a second major release of software

08/31/11

-To address additional Spiral 3 known bugs and requested features for Stanford-supported software in GENI campus deployments. This includes software provided by Stanford and by Stanford’s GENI subcontractors. Currently this list includes FlowVisor, NOX and any other Stanford-recommended controllers, Indigo, SNAC, Expedient and Opt-In Manager

ERM

S3.d

Documentation and Code Release.

04/05/11

-Submit the architectural design, including PCB layouts, hardware source codes, and software releases related to the ERM Box.
-Submit the simulation source code and results.

ERM

S3.f

Final report and code release.

08/15/11

-Describe the infrastructures in which the ERM boxes were deployed, and what special requirements these infrastructures required.
-Submit the source code used in running the experiment. Demonstrate the accessibility of the ERM box by non-
GENI researchers to conduct experiments.
- Further, summarize the achievements made in the earlier milestones.

GpENI

S3.g

KSU CoreDirector.

07/31/11

-Obtain and install KSU CoreDirector, subject to availability and based on Ciena commitment to obtain CoreDirector from I2.

GUSH

S3.d

Enhanced usability through Gush GUI.

06/15/11

-Provide enhanced usability through Gush GUI. (This will involve another major Nebula release and additional Nebula documentation.)

GUSH

S3.f

Deliver software and documentation.

08/26/11

-Deliver Gush/Nebula software and documentation to GPO.
- Deliver experimenter guides/tutorials and examples.

Hive

S3.f

Deliver software and documentation.

09/09/11

-Hive Mind source code and documentation.
- Report on the efficacy of the Hive Mind system including types of threats it is able to detect and a characterization of false positives/negatives generated.
-Updated paper on Security Experimentation with
GENI.

iGENI

S3.f

Documentation and Code Release.

08/15/11

- Implement the GENI AM API on ORCA aggregate, when these capabilities are provided by enhanced ORCA code

IMF

S3.d

Documentation and Code Release.

04/05/11

-Code snapshot from IMF version control repository used in the above demonstration will be released, and will include, in separate overview documents as well as detailed in-code comments, enough documentation to allow other researchers who desire to re-use the in-stack measurement consumption functionality of IMF to get started. Pointers to snapshot will be released on the GENI wiki and the IMF project wiki.

IMF

S3.f

Documentation and Code Release.

08/15/11

-Code snapshot of IMF, with documentation, used in above demonstration, as above.

INSTOOLS

S3.f

Documentation and Code Release.

08/15/11

-Deliver latest stable version of this project’s software, documentation and tutorial exercises including software demonstrated at GEC11.

Kansei

S3.f

Final report and code release.

08/15/11

-Includes:
-- Final project report summarizing KanseiGenie design and capabilities as well as findings
-- V2.0 of KanseiGenie installer

LAMP

S3.h

Deliver software, documentation, user guides.

08/26/11

-Deliver software with documentation
- Deliver user guides, tutorials, sample experiments

LEARN

S3.e

Documentation and Code Release.

04/05/11

-Participate in developing a plan for monitoring and troubleshooting the L2 connectivity from NLR, through LEARN, and to each campus, utilizing the evolving commercial protocols and capabilities.

LEARN

S3.g

Documentation and Code Release.

08/15/11

-Includes applicable handlers, ORCA task/resource assignment code, and guidelines for the GENI community towards creating a similar infrastructure integration using Cisco 3400s.

MeasurementSys

S3.f

Deliver software and documentation.

08/09/11

-Software with documentation
- Installation guides
- Experimenter guides

MILNGENI

S3.e

Documentation and Code Release.

08/15/11

-Latest stable version of MNG software and tutorial exercises including software demonstrated at GEC11.

NETKARMA

S3.f

Deliver software and documentation.

08/26/11

-Documentation for experimenters on how to collect and use provenance information.
- NetKarma software and documentation.
- Description of how additional source of provenance information identified in Milestone e will be used.

OFSTAN

S3.f

Implement, test, and release a second major release of software

08/31/11

-Implement, test, and release a second major release of software to address additional Spiral 3 known bugs and requested features for Stanford-supported software in GENI campus deployments. This includes software provided by Stanford and by Stanford’s GENI subcontractors. Currently this list includes FlowVisor, NOX and any other Stanford-recommended controllers, Indigo, SNAC, Expedient and Opt-In Manager.

OKGEMS

S3.d

Documentation and Code Release.

04/05/11

-Update testbed documents and sample experiments

OKGEMS

S3.f

Documentation and Code Release.

08/15/11

- Finish documentation and tutorial. Publish some preliminary results.

OnTime

S3.f

Release a software version of OnTimeMeasure that is integrated with other GENI software tools/services

09/30/11

-Software package with detailed documentation for setup and operation with other mature sets of GENI software tools/services pertaining to Experiment Workflow, Security, Measurement, and Operations.

ORBIT

S3.d

Documentation and Code Release.

04/05/11

-Updated OMF/OML code release and documentation through mytestbed.net

ORBIT

S3.f

Final report and code release.

08/15/11

-Updated OMF/OML code release and documentation through mytestbed.net

ORCAAUG

S3.f.4

ORCA Camano 3.1 code release and
documentation

08/15/11

 

ORCABEN

S3.f.1

GUSH integration (w/ GUSH team)

07/31/11

 

ORCABEN

S3.f.2

ORCA Camano 3.1 code release, documentation and final report

08/15/11

 

PGTools

S3.d

V2.0 of experimenter tools

04/15/11

 

PGTools

S3.g

V2.0 of map interface released.

08/31/11

 

PrimoGENI

S3.f

Deliver software, documentation,
user guides.

08/19/11

-Deliver software with documentation
- Deliver user guides, tutorials, sample experiments

ProtoGENI

S3.e

Software and documentation release.

08/30/11

-Deliver latest stable version of Emulab software and documentation, containing all ProtoGENI software developed under this contract.
- Deliver help documents/tutorials developed under this contract.

RAVEN

S3.c

Raven Release.

05/13/11

-Online documentation/tutorials/examples
-Deliver software and documentation.

RAVEN

S3.e

Raven Release.

08/15/11

-Updated online documentation/tutorials/examples
- Deliver software and documentation.

S3MONITOR

S3.f

Software and documentation release.

08/26/11

-Software with documentation including instructions for installation and use. Lead: HP Labs
- Document/web page describing how S3MONITOR can fit into at least one of the Sol. 3 I&M framework projects. Lead: HP Labs

SCAFFOLD

S3.f

Deliver software and documentation.

09/09/11

-SCAFFOLD source code and documentation
- Software and documentation for a service built on "SCAFFOLD on
GENI"
- Updated guides/tutorials/scripts for
GENI experimenters/service builders wishing to deploy own SCAFFOLD network on which to build/deploy own services.

SECUREUPDATES

S3.e

Deliver software and documentation.

08/19/11

-Deliver software with documentation
-Deliver updated guide for software developers planning on using TUF as their updater

SHADOW

S3.c

Develop instrumentation tools to make Juniper router info available to ProtoGENI users

05/31/11

-Develop instrumentation tools to make the collected information from the Juniper routers available to ProtoGENI users so they can observe the virtualized router behavior of their experiments.(Kentucky)

SPP

S3.d

NPE Software Revision

07/30/11

-We expect to complete and deploy a new version of the software for the SPP’s Network Processing Engine. This will more than double the computational resources available for application-specific packet processing, significantly increasing system throughput, and will provide substrate support for multicast.

UMLPEN

S3.d

UMLPEN is an operational aggregate.

05/01/11

-Continuously available
- Implements the
GENI API
- Provides experimenter support (web pages, online tutorials, etc)
- Trusts all four
GENI clearinghouses
- Supports
GENI operations as it relates to the UMLPEN aggregate

ViSE

S3.d

Documentation and Code Release.

04/05/11

-Documentation for running the enhanced alpha demonstration. Amazon images with builds of Orca for the community and operational virtual machines with OpenVPN support for researchers. Documentation on how to use these AMIs will be provided.

ViSE

S3.f

Final report and code release.

08/15/11

-Release demonstration code to community.

VMI-FED

S3.g

VMI Software and documentation.

09/09/11

- Deliver VMI software and documentation for GENI experimenters.

WiMAX

S3.d

Documentation and Code Release.

04/05/11

-Release of GBSN controller software including RF AggrMgr, ASN Gateway, ASNGW AggrMgr, virtual Base Station (vBS), vBS AggMgr, Switch AggMgr, and operations/management modules. Documentation to be updated and posted on GENI site.

WiMAX

S3.f

Final report and code release.

08/15/11

-Final report on GENI WiMAX base station including architecture, design details and performance validation results. Full code release and documentation with all major software features demonstrated at GEC11.

WIMXCOLUM

S3.d

Documentation and Code Release.

04/05/11

-Update documentation of your WiMAX base station site
-For WiMAX experiments/demos, place description and any required code in the WiMAX experiment repository.

WIMXCOLUM

S3.f

Documentation and Code Release.

08/15/11

-Update documentation of your WiMAX base station site
-For WiMAX experiments/demos, place description and any required code in the WiMAX experiment repository.

WIMXNYUPT

S3.d

Documentation and Code Release.

04/05/11

-Update documentation of your WiMAX base station site
- For WiMAX experiments/demos, place description and any required code in the WiMAX experiment repository.

WIMXNYUPT

S3.f

Documentation and Code Release.

08/15/11

-Update documentation of your WiMAX base station site
- For WiMAX experiments/demos, place description and any required code in the WiMAX experiment repository.

WIMXRG

S3.f

Documentation and Code Release.

08/15/11

-Final report including technical details of WiMAX base station kit and related software features. Updated code release corresponding to capabilities demonstrated at GEC11.

WIMXUCLA

S3.d

Documentation and Code Release.

04/05/11

-Update documentation of your WiMAX base station site
- For WiMAX experiments/demos, place description and any required code in the WiMAX experiment repository.

WIMXUCLA

S3.f

Documentation and Code Release.

08/15/11

- Update documentation of your WiMAX base station site
- For WiMAX experiments/demos, place description and any required code in the WiMAX experiment repository.

WIMXUCO

S3.d

Documentation and Code Release.

04/05/11

-Update documentation of your WiMAX base station site
-For WiMAX experiments/demos, place description and any required code in the WiMAX experiment repository.

WIMXUCO

S3.f

Documentation and Code Release.

08/15/11

-Update documentation of your WiMAX base station site
-For WiMAX experiments/demos, place description and any required code in the WiMAX experiment repository.

WIMXUMASS

S3.d

Documentation and Code Release.

04/05/11

-Update documentation of your WiMAX base station site
- Document prototype of brick supporting a WiMAX client (not deployed on buses). (milestone shared with DOME project 1599)

WIMXUMASS

S3.f

Documentation and Code Release.

08/15/11

-WiMAX deployed on up to 4 buses
-DOME updated to allocate WiMAX on buses, scheduling and execution of experiments that access the WiMAX link. (milestone shared with DOME project 1599)

WIMXUWI

S3.d

Documentation and Code Release.

04/05/11

-Update documentation of your WiMAX base station site
- For WiMAX experiments/demos, place description and any required code in the WiMAX experiment repository.

WIMXUWI

S3.f

Documentation and Code Release.

08/15/11

- Acquire and deploy the Wisconsin Mobility Services Engine into MadBed testbed, and document exposed API.
- Update documentation of your WiMAX base station site
- For WiMAX experiments/demos, place description and any required code in the WiMAX experiment repository.