Version 3 (modified by 14 years ago) (diff) | ,
---|
GIR 3.1 Candidates
This is the full list of Spiral 3 software milestones that are due by March 31, 2011 and are potentially to be evaluated for GIR3.1:
Project |
Milestone |
Milestone Title |
Due Date |
Description |
COGRADIO |
S3.a |
Documentation and Code Release. |
12/01/10 |
-Release
a full set of design information for stand-alone cognitive radio system
“kit”, including hardware and v0.1 software. |
DICLOUD |
S3.b |
Documentation and Code Release. |
11/18/10 |
-This
code release will include the AWS accounting service, updated Orca handlers
for EC2, S3 and EBS, as well as the DiCloud Web Portal. Documentation on the
software installation and usage will be provided. |
DIGOBREG |
S3.b |
Documentation and Code Release. |
11/18/10 |
-Document the design of the planned MDA prototype. |
DOME |
S3.b |
Documentation and Code Release. |
11/18/10 |
-Bring-up
of DOME suite and virtualization on new bricks with CI270CW motherboard.
These bricks are different from the bricks currently being used in DOME
(different processor and chipset, expanded I/O capabilities). The goal is to
be able to use the mini PCIe slot to support a WiMAX client. (milestone
shared with WiMAX project 1731). |
ENTGENI |
S3.d |
Implement, test, and release a major Spiral 3 release |
01/31/11 |
-To address existing Spiral 2 and Spiral 3 known bugs and requested features for Stanford-supported software in GENI campus deployments. This includes software provided by Stanford and by Stanford’s GENI subcontractors. Currently this list includes FlowVisor, NOX and any other Stanford-recommended controllers, Indigo, SNAC, Expedient and Opt-In Manager |
ERM |
S3.b |
Documentation and Code Release. |
11/18/10 |
- Report the progress made in spirals 1 & 2; present the roadmap for achieving the spiral 3 milestones. |
GUSH |
S3.a |
Gush compatible with GENI AM API. |
02/15/11 |
-Rewrite Gush interface to PlanetLab and ProtoGENI to adhere to new Aggregate Manager/SFA APIs.. |
GUSH |
S3.b |
Gush to support ORCA resources. |
03/05/11 |
-Extend Gush to support ORCA resources (also using new Aggregate Manager/SFA API). |
iGENI |
S3.b |
Documentation and Code Release. |
12/31/10 |
-Participate
in defining a Cluster D plan for naming and stitching L2 connectivity across
Clusters C and D. |
iGENI |
S3.d |
Documentation and Code Release. |
03/31/11 |
-Export operational status of your ORCA instance to the GMOC |
IMF |
S3. b |
Documentation and Code Release. |
11/18/10 |
None |
INSTOOLS |
S3.b |
Documentation and Code Release. |
11/18/10 |
-Contribute
Instrumentation Tools project software that has been integrate and tested in
the ProtoGENI cluster. Instrumentation Tools project software in this
release will mainly cover functions developed and integrated in Spiral 2. |
LEARN |
S3.b |
Documentation and Code Release. |
11/18/10 |
-Includes release of handler code for Cisco 3400 switches for VLAN management in ORCA. |
OFSTAN |
S3.c |
Develop, test and release the reference implementation of the OpenFlow 1.1 draft specification. |
01/31/11 |
|
OFSTAN |
S3.d |
Implement, test, and release a major Spiral 3 release |
01/31/11 |
-Implement, test, and release a major Spiral 3 release to address existing Spiral 2 and Spiral 3 known bugs and requested features for Stanford-supported software in GENI campus deployments. This includes software provided by Stanford and by Stanford’s GENI subcontractors. Currently this list includes FlowVisor, NOX and any other Stanford-recommended controllers, Indigo, SNAC, Expedient and Opt-In Manager. |
OKGEMS |
S3.b |
Documentation and Code Release. |
11/18/10 |
-Document testbed and sample experiments |
OnTime |
S3.b |
Release a software version of OnTimeMeasure that can function across multiple aggregates |
11/30/10 |
-Software package with detailed documentation for setup and operation on a multi-federation measurement testbed that spans multiple aggregates (e.g., ProtoGENI, PlanetLab, KanseiGenie) |
ORBIT |
S3.b |
Documentation and Code Release. |
11/18/10 |
-Includes updated OMF/OML code release and documentation through mytestbed.net, ParkNet code samples interfacing with OMF/OML |
ORCAAUG |
S3.b.1 |
ORCA intermediate code release and documentation |
12/31/10 |
None |
ORCAAUG |
S3.d.2 |
ORCA Camano 3.0 code release and documentation. |
03/31/11 |
none |
ORCABEN |
S3.b.1 |
ORCA intermediate code release and documentation |
12/31/10 |
|
ORCABEN |
S3.b.8 |
XMLRPC controller implementing GENI AM API v1. |
02/01/11 |
|
ORCABEN |
S3.d.1 |
ORCA Camano 3.0 code release and documentation. |
03/31/11 |
|
PGTools |
S3.b |
Prepare tools for export to other Emulab sites. |
12/15/10 |
-Right now, they run fine with the Utah Emulab acting as the front-end (including instantiating slivers on other aggregates), but work and documentation are needed for other Emulab sites to be able to act as front-ends. |
S3MONITOR |
S3.b |
Software and documentation release. |
01/31/11 |
-Software
with documentation including usable instructions for installation and use.
Lead: HP Labs |
TIED |
S3.b |
A machine-readable file of rules and attributes usable with the code of milestone S3.a, with instructions for use |
02/01/11 |
-Release
a package of ABAC rules and attributes usable with the above code that
implements the current GENI API identity based authorization model within ABAC, for
simple transition. |
TIED |
S3.c |
Continue development of ABAC (Attribute Based Access Control) and integrate into the GENI API, emphasizing both function and usability. |
03/17/11 |
-Release low-level command-line tools for a) creating and managing ABAC attributes in X.509 certificate format and b) interpreting ABAC authorization decisions in human-readable format. (Deliverable: release of code implementing these tools with notification to the control framework working group mailing list two weeks before GEC10 and demonstration of the system at GEC 10). |
ViSE |
S3.b |
Documentation and Code Release. |
11/18/10 |
-Code and setup documentation for GEC9 alpha demonstration. |
WiMAX |
S3.b |
Documentation and Code Release. |
11/18/10 |
-Release of GBSN controller software including RF AggrMgr, ASN Gateway, ASNGW AggrMgr, virtual Base Station (vBS), and vBS AggMgr modules. Documentation to be updated and posted on GENI site. |
WIMXCOLUM |
S3.b |
Documentation and Code Release. |
11/18/10 |
-Update
documentation of your WiMAX base station site |
WIMXNYUPT |
S3.b |
Documentation and Code Release. |
11/18/10 |
-
Update documentation of your WiMAX base station site |
WIMXUCLA |
S3.b |
Documentation and Code Release. |
11/18/10 |
-Update
documentation of your WiMAX base station site |
WIMXUCO |
S3.b |
Documentation and Code Release. |
11/18/10 |
-Update
documentation of your WiMAX base station site |
WIMXUMASS |
S3.b |
Documentation and Code Release. |
11/18/10 |
-Bring-up of DOME suite and virtualization on new bricks with CI270CW motherboard. These bricks are different from the bricks currently being used in DOME (different processor and chipset, expanded I/O capabilities). The goal is to be able to use the mini PCIe slot to support a WiMAX client. (milestone shared with DOME project 1599) |
WIMXUWI |
S3.b |
Documentation and Code Release. |
11/18/10 |
-Update
documentation of your WiMAX base station site |
GENI Integration Release 2.1 Guidelines Spiral 2 Release 1